Blue/Green Deployments
A blue/green deployment runs two complete production environments. One (say blue) serves all traffic; the new version is deployed to the idle one (green), tested there with production configuration, and then traffic is switched in one step. Rolling back is switching back.
before switch after
users ──► router ──► blue v1 users ──► router ──► green v2 (blue v1 kept idle for rollback)
green v2 (testing)| Rolling | Blue/green | |
|---|---|---|
| Versions serving at once | both, during the rollout | one (the switch is atomic) |
| Extra capacity | maxSurge pods |
a full second environment during the release |
| Rollback | another rollout (minutes) | flip the router back (seconds) |
| Testing before users see it | no | yes: smoke tests against green before the switch |
| Database | shared, must be compatible | usually shared too, so the same compatibility rule applies |
Where the switch happens
| Layer | How you switch |
|---|---|
| DNS | change a record's target; slow and uneven because of caching (TTL), rarely used alone |
| Load balancer | move the listener or target group (AWS ALB target groups, an Nginx upstream, a HAProxy backend) |
| Kubernetes Service | change the Service's selector from version: blue to version: green |
| Gateway API / service mesh | change the backendRefs weights from 100/0 to 0/100 |
| Platform feature | AWS CodeDeploy blue/green, Azure App Service deployment slots, Argo Rollouts blueGreen strategy |
In Kubernetes, the simplest form is two Deployments and one Service:
apiVersion: v1
kind: Service
metadata:
name: shop
spec:
selector:
app: shop
slot: blue # the pipeline patches this to "green" to switch
ports:
- port: 80
targetPort: 8080# the switch step of a pipeline (sample session: needs a cluster)
kubectl -n shop rollout status deployment/shop-green --timeout=5m
./ci/smoke-test.sh http://shop-green.shop.svc.cluster.local
kubectl -n shop patch service shop -p '{"spec":{"selector":{"app":"shop","slot":"green"}}}'deployment "shop-green" successfully rolled out
smoke test: 12/12 checks passed
service/shop patched
Argo Rollouts automates exactly this (activeService, previewService, autoPromotionEnabled); it is covered in the GitOps course.
A simulation: switch and switch back
The model sends a fixed stream of requests through a router while a release happens. Green has a bug that fails 30 % of one endpoint's requests (seeded random, so the run is repeatable). The smoke test against green before the switch only covers some endpoints, so the bug gets through; the error rate after the switch triggers a switch back:
import random
rng = random.Random(42)
ENDPOINTS = ["/", "/cart", "/checkout", "/search"]
def handle(version, path):
if version == "green" and path == "/checkout":
return 500 if rng.random() < 0.30 else 200
return 200
def smoke_test(version, paths):
return all(handle(version, p) == 200 for p in paths)
live, idle = "blue", "green"
print("smoke test green on / and /cart:", "pass" if smoke_test(idle, ["/", "/cart"]) else "fail")
live, idle = idle, live
print(f"switch: live={live}")
window = []
for minute in range(1, 7):
errors = sum(handle(live, rng.choice(ENDPOINTS)) == 500 for _ in range(200))
window.append(errors / 200)
print(f" minute {minute}: live={live:<5} error rate {errors / 200:5.1%}")
if live == "green" and len(window) >= 2 and min(window[-2:]) > 0.02:
live, idle = idle, live
window.clear()
print(f" -> error rate above 2% for 2 minutes: switch back, live={live}")smoke test green on / and /cart: pass
switch: live=green
minute 1: live=green error rate 7.0%
minute 2: live=green error rate 9.5%
-> error rate above 2% for 2 minutes: switch back, live=blue
minute 3: live=blue error rate 0.0%
minute 4: live=blue error rate 0.0%
minute 5: live=blue error rate 0.0%
minute 6: live=blue error rate 0.0%
The switch back took seconds and needed no redeploy, because blue was still running v1. That is blue/green's main selling point. Its weaknesses show in the same run: every user hit the bug for two minutes, because the switch is all-or-nothing. A canary would have exposed only a few percent of users (Canary Releases).
Practical points
- Keep blue until you're sure. Tear down (or scale down) the old environment only after the new one has run a full traffic cycle; some teams keep it until the next release.
- Warm up green. Caches, JIT compilers and connection pools are cold; send synthetic traffic before the switch.
- Long-lived connections (WebSockets, gRPC streams) stay on blue after the switch until they reconnect; drain them deliberately.
- Cost: two full environments during the release. On Kubernetes, green can be scaled from zero, which reduces the cost to the duration of the release.
- Databases are shared by both colours, so schema changes must work with both versions (Rollback & Database Changes).
Test yourself
What makes blue/green rollback fast?
- Images are cached
- The previous version is still running, so rollback is just switching the router back
- Kubernetes rolls back automatically
- DNS updates instantly
What is blue/green's main weakness compared with a canary?
- It needs more tests
- The switch is all-or-nothing, so a bug the smoke tests missed hits every user at once
- It can't roll back
- It requires DNS
Why is switching only by DNS rarely enough?
- DNS can't point to two servers
- Clients and resolvers cache records for the TTL, so traffic moves slowly and unevenly
- DNS is insecure
- It's too fast