TExcelTAD
Home › Lab Skills: Measurement, Uncertainty & Graphs › Mini Project: Measuring g with a Pendulum

Mini Project: Measuring g with a Pendulum

The challenge

Measure the acceleration of free fall, gg, with nothing more than a string, a small heavy bob, a metre rule and a stopwatch, and give your answer with its uncertainty. Then write it up as a full lab report. This project uses every part of the course: a fair test, reading instruments, repeated readings, a table, a linearised graph, a gradient with its uncertainty and a conclusion with an evaluation.

Below you will find a complete sample: plan, data, analysis and write-up. Do the experiment yourself and use the sample as a model for your own report. (If you prefer, Option B at the end measures a spring constant instead.)

Safety

Note: Clamp the stand to the bench, or weigh its base down, so it can't topple. Keep the swing small and stand out of its path. Use a bob of at most about 100 g100\ \text{g}. Don't stand on chairs to reach a long pendulum: use lengths you can reach from the floor.

Theory

For small swings (below about 10∘10^\circ), the period of a simple pendulum is

T=2πLg⇒T2=4π2g LT = 2\pi\sqrt{\frac{L}{g}} \qquad \Rightarrow \qquad T^2 = \frac{4\pi^2}{g}\,L

where LL is the length from the pivot to the centre of the bob. A graph of T2T^2 against LL should be a straight line through the origin with gradient m=4π2gm = \frac{4\pi^2}{g}, so g=4π2mg = \frac{4\pi^2}{m}.

Apparatus and set-up

  • clamp stand, boss and clamp; two small wooden blocks to grip the string
  • thread (about 1 m1\ \text{m}) and a metal bob (or a nut or key)
  • metre rule (1 mm1\ \text{mm} divisions); vernier caliper for the bob's diameter (optional)
  • stopwatch (or phone), a marker (a pencil line on paper under the lowest point)
L marker at the lowest point string clamped betweentwo blocks (fixed pivot) small swing:less than 10 degrees

Plan

Variable Kind How
length LL independent 0.3000.300 to 0.800 m0.800\ \text{m} in steps of 0.100 m0.100\ \text{m}, measured with the metre rule from the blocks to the centre of the bob; ΔL=0.001 m\Delta L = 0.001\ \text{m} (two readings of ±0.5 mm\pm 0.5\ \text{mm})
period TT dependent time 20 full swings, three times for each length; T=tˉ20T = \frac{\bar{t}}{20}
amplitude, bob, string, pivot controlled swings below 10∘10^\circ, same bob and thread, string gripped between the blocks so the pivot doesn't move

A full swing is there and back: start the stopwatch as the bob passes the marker going one way, count "zero", and stop at "twenty" when it passes the marker going the same way again.

Results (sample)

LL / m t1t_1 / s t2t_2 / s t3t_3 / s tˉ\bar{t} / s Δt\Delta t / s
0.300 21.84 22.07 21.95 21.95 0.12
0.400 25.41 25.30 25.25 25.32 0.08
0.500 28.36 28.45 28.21 28.34 0.12
0.600 31.12 30.97 31.07 31.05 0.08
0.700 33.46 33.62 33.55 33.54 0.08
0.800 35.97 35.81 35.90 35.89 0.08

Δt\Delta t is half the range of the three timings. (It is kept to two figures here because it is used again below.)

Analysis

Processed data. T=tˉ20T = \frac{\bar{t}}{20}, ΔT=Δt20\Delta T = \frac{\Delta t}{20}, and by the power rule Δ(T2)=2ΔTT×T2=2T ΔT\Delta(T^2) = 2\frac{\Delta T}{T} \times T^2 = 2T\,\Delta T:

LL / m TT / s ΔT\Delta T / s T2T^2 / s2\text{s}^2 Δ(T2)\Delta(T^2) / s2\text{s}^2
0.300 1.098 0.006 1.205 0.013
0.400 1.266 0.004 1.603 0.010
0.500 1.417 0.006 2.008 0.017
0.600 1.553 0.004 2.411 0.012
0.700 1.677 0.004 2.813 0.013
0.800 1.795 0.004 3.221 0.014

Worked for the first row: T=21.953 s20=1.098 sT = \frac{21.953\ \text{s}}{20} = 1.098\ \text{s}; ΔT=0.115 s20=0.006 s\Delta T = \frac{0.115\ \text{s}}{20} = 0.006\ \text{s}; T2=1.205 s2T^2 = 1.205\ \text{s}^2; Δ(T2)=2×1.098×0.00575=0.013 s2\Delta(T^2) = 2 \times 1.098 \times 0.00575 = 0.013\ \text{s}^2.

Graph. T2T^2 against LL. The points lie on a straight line through the origin. The error bars (±0.01\pm 0.01 to 0.02 s20.02\ \text{s}^2, and ±0.001 m\pm 0.001\ \text{m} across) are smaller than the dots at this scale.

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.0 0.4 0.8 1.2 1.6 2.0 2.4 2.8 3.2 3.6 L / m T^2 / s^2 A (0.10, 0.40) B (0.85, 3.42)

Gradient. From two points on the best-fit line, A(0.10 m,0.40 s2)A(0.10\ \text{m}, 0.40\ \text{s}^2) and B(0.85 m,3.42 s2)B(0.85\ \text{m}, 3.42\ \text{s}^2):

m=3.42 s2−0.40 s20.85 m−0.10 m=3.02 s20.75 m=4.03 s2/mm = \frac{3.42\ \text{s}^2 - 0.40\ \text{s}^2}{0.85\ \text{m} - 0.10\ \text{m}} = \frac{3.02\ \text{s}^2}{0.75\ \text{m}} = 4.03\ \text{s}^2/\text{m}

Uncertainty of the gradient. Steepest and shallowest lines through the ends of the first and last error bars, (0.300,1.205±0.013)(0.300, 1.205 \pm 0.013) and (0.800,3.221±0.014)(0.800, 3.221 \pm 0.014):

msteep=3.235−1.1920.500=4.086 s2/m,mshallow=3.207−1.2180.500=3.978 s2/mΔm=4.086−3.9782=0.054 s2/m\begin{aligned} m_{steep} &= \frac{3.235 - 1.192}{0.500} = 4.086\ \text{s}^2/\text{m}, \qquad m_{shallow} = \frac{3.207 - 1.218}{0.500} = 3.978\ \text{s}^2/\text{m} \\ \Delta m &= \frac{4.086 - 3.978}{2} = 0.054\ \text{s}^2/\text{m} \end{aligned}

gg and its uncertainty.

g=4π2m=39.484.027 s2/m=9.80 m/s2Δgg=Δmm=0.0544.027=0.013=1.3%Δg=0.013×9.80=0.13 m/s2≈0.1 m/s2\begin{aligned} g &= \frac{4\pi^2}{m} = \frac{39.48}{4.027\ \text{s}^2/\text{m}} = 9.80\ \text{m/s}^2 \\ \frac{\Delta g}{g} &= \frac{\Delta m}{m} = \frac{0.054}{4.027} = 0.013 = 1.3\% \qquad \Delta g = 0.013 \times 9.80 = 0.13\ \text{m/s}^2 \approx 0.1\ \text{m/s}^2 \end{aligned}

Result: g=(9.8±0.1) m/s2g = (9.8 \pm 0.1)\ \text{m/s}^2.

Cross-check with one length. For L=0.800 mL = 0.800\ \text{m} alone: g=4π2×0.8001.79472=9.81 m/s2g = \frac{4\pi^2 \times 0.800}{1.7947^2} = 9.81\ \text{m/s}^2, with Δgg=0.0010.800+2×0.0041.795=0.6%\frac{\Delta g}{g} = \frac{0.001}{0.800} + 2 \times \frac{0.004}{1.795} = 0.6\%. It agrees. The graph is still the better method: it uses all six lengths, shows that T2∝LT^2 \propto L really holds, and isn't spoiled if every length is off by the same amount (that would only move the intercept).

Check one row with the simulation: set L=0.80 mL = 0.80\ \text{m}; the period shown, 1.80 s1.80\ \text{s}, matches the measured 1.795 s1.795\ \text{s}.

θmgEkEpθt8°−8°T = 1.80 s

Sample conclusion and evaluation

Conclusion. T2T^2 was directly proportional to LL from 0.3000.300 to 0.800 m0.800\ \text{m} (a straight line through the origin), as T=2πL/gT = 2\pi\sqrt{L/g} predicts. The gradient, (4.03±0.05) s2/m(4.03 \pm 0.05)\ \text{s}^2/\text{m}, gives g=(9.8±0.1) m/s2g = (9.8 \pm 0.1)\ \text{m/s}^2, in agreement with the accepted 9.8 m/s29.8\ \text{m/s}^2 (percentage difference below 0.5%0.5\%, uncertainty 1.3%1.3\%).

Evaluation. The largest uncertainty was the timing: the three timings at each length spread by up to 0.24 s0.24\ \text{s}, from reaction time at the start and stop; timing 20 swings reduced it to at most 0.006 s0.006\ \text{s} per period. The length was measured to ±1 mm\pm 1\ \text{mm} (0.3%0.3\% at 0.300 m0.300\ \text{m}); judging the centre of the bob by eye could add a systematic error, which would shift the intercept but not the gradient. Improvements: use a light gate or a slow-motion phone video for the timing; measure to the top of the bob and add half its diameter measured with a vernier caliper; extend the range to 1.5 m1.5\ \text{m} for a longer line.

Your report checklist

  • Title, aim, theory with the formula and what you will plot
  • Labelled diagram, variables, a method someone else can follow, safety
  • Raw timings table with headings and units; processed table (TT, T2T^2, uncertainties)
  • Graph of T2T^2 against LL with labelled axes, best-fit line and (if visible) error bars
  • Gradient from a large triangle; steepest/shallowest lines; g=4π2mg = \frac{4\pi^2}{m} with Δg\Delta g
  • Conclusion with (g±Δg)(g \pm \Delta g) and a comparison with 9.8 m/s29.8\ \text{m/s}^2
  • Evaluation: the biggest uncertainty, any systematic error, specific improvements

Option B: the spring constant

Hang a spring from a clamp with a pointer at its bottom and a metre rule beside it. Add loads of 0.5 N0.5\ \text{N} up to 3.0 N3.0\ \text{N} (a sand tray underneath, eye protection on), reading the pointer each time; repeat while unloading. Plot extension against load with error bars of ±1 mm\pm 1\ \text{mm}, find the gradient mm with steepest and shallowest lines, and the spring constant k=1mk = \frac{1}{m}, which has the same percentage uncertainty as mm. The spring examples in Plotting a Graph and Error Bars show the method.

Test yourself

Why is the length LL measured to the centre of the bob?

  1. It is easier
  2. The formula uses the distance from the pivot to the centre of mass of the bob
  3. To make the period shorter
  4. It doesn't matter

The gradient of T2T^2 against LL is 4.03 s2/m4.03\ \text{s}^2/\text{m} with a 1.3%1.3\% uncertainty. What is the percentage uncertainty of gg?

  1. 0.65%0.65\%
  2. 1.3%1.3\%
  3. 2.6%2.6\%
  4. 4.03%4.03\%

Three timings of 20 swings are 28.3628.36, 28.4528.45 and 28.21 s28.21\ \text{s}. What is ΔT\Delta T for one period, using half the range?

  1. 0.12 s0.12\ \text{s}
  2. 0.24 s0.24\ \text{s}
  3. 0.006 s0.006\ \text{s}
  4. 0.012 s0.012\ \text{s}

If every length had been measured 1 cm1\ \text{cm} too short, what would happen to the T2T^2–LL graph?

  1. The gradient would change a lot
  2. The line would shift sideways and miss the origin, but the gradient (and gg) would stay the same
  3. The points would no longer lie on a line
  4. Nothing at all