Protection and Reliability: Overcurrent, Desaturation, Soft Start and Derating
A converter that meets every specification on the bench can still die in its first week: an output shorted by a dropped screwdriver, a hot day in a sealed box, a cable plugged in live, a motor that stalls. Protection decides whether those events cost a fuse or a board, and reliability engineering decides whether the converter is still working after ten years of normal days. This lesson works through the protections every converter needs (overcurrent, short circuit, desaturation for IGBT and SiC bridges, under- and overvoltage, soft start and inrush) and the arithmetic of derating, capacitor life and failure rates. The examples use the to , buck of the DC-DC lessons (Component Selection).
Overcurrent: cycle-by-cycle, foldback and hiccup
The fastest protection is the peak current limit: a comparator ends the on-time as soon as the switch current reaches . The sense signal (a shunt, the MOSFET's own , or a current transformer) carries a spike at turn-on from the diode's reverse recovery and the switch-node capacitance, so the comparator is blanked for the first to (leading-edge blanking). The limit acts one propagation delay late, so the peak overshoots by : here, harmless.
A hard short on the output is different. The inductor then sees almost nothing during the off-time (only the diode drop and its own resistance), so the current hardly falls, while the controller cannot make the on-time shorter than its minimum on-time. If the rise in that minimum on-time exceeds the fall in the rest of the period, the current ratchets up cycle after cycle, past the limit, until the inductor saturates. Controllers prevent this by lowering the switching frequency when the output voltage is low (frequency foldback), by foldback of the current limit itself, or by hiccup: after a number of limited cycles they stop for many milliseconds and retry, so the average current and the heating stay small.
Worked example: a short on the buck's output
Given: the buck with , (DCR ), , Schottky , current limit , minimum on-time ; the output is shorted.
Find: the current change per cycle at the limit, whether the current runs away, and the frequency that stops it.
Solve:
Check: , so the current gains about per cycle at and keeps climbing, until the falling slope ( grows with ) catches up near , beyond the inductor's saturation current. Halving the frequency roughly doubles the off-time and the fall, to , and the limit holds. The code runs 400 cycles of the short at several frequencies.
import numpy as np
# Buck 24 V -> 12 V, L = 56 uH (DCR 38 mohm), 200 kHz, Schottky 0.45 V, peak current limit 3.5 A.
# The output is shorted: during the off-time the inductor only sees the diode and its own resistance.
Vin, L, dcr, Vf, fsw, I_lim = 24.0, 56e-6, 0.038, 0.45, 200e3, 3.5
t_on_min, t_delay = 150e-9, 100e-9 # controller's minimum on-time, current-limit delay
def short_circuit(f, cycles=400):
i, peak = 2.0, 0.0
Ts = 1 / f
for _ in range(cycles):
# on: the switch stays on at least t_on_min, and t_delay past the limit
t_hit = max((I_lim - i) * L / Vin, 0.0)
t_on = max(t_on_min, t_hit + t_delay)
i += Vin * t_on / L
peak = max(peak, i)
# off: di/dt = -(Vf + i dcr) / L, solved exactly over Ts - t_on
tau = L / dcr
i = (i + Vf / dcr) * np.exp(-(Ts - t_on) / tau) - Vf / dcr
i = max(i, 0.0)
return i, peak
rise = Vin * t_on_min / L
fall = (Vf + I_lim * dcr) / L * (1 / fsw - t_on_min)
print(f"in a short at 3.5 A: rise per cycle {rise*1e3:.1f} mA (minimum on-time), fall {fall*1e3:.1f} mA")
for f in (200e3, 100e3, 50e3, 25e3):
i, pk = short_circuit(f)
print(f"f = {f/1e3:5.0f} kHz: valley after 400 cycles {i:6.2f} A, peak {pk:6.2f} A")
# hiccup: 1 ms of trying at the limit, then 15 ms off
on, off = 1e-3, 15e-3
print(f"hiccup, 1 ms at the limit then 15 ms off: average inductor current about {I_lim*on/(on+off):.2f} A")in a short at 3.5 A: rise per cycle 64.3 mA (minimum on-time), fall 50.5 mA
f = 200 kHz: valley after 400 cycles 6.55 A, peak 6.61 A
f = 100 kHz: valley after 400 cycles 3.44 A, peak 3.54 A
f = 50 kHz: valley after 400 cycles 3.34 A, peak 3.54 A
f = 25 kHz: valley after 400 cycles 3.14 A, peak 3.54 A
hiccup, 1 ms at the limit then 15 ms off: average inductor current about 0.22 A
At the current has reached after ; from down, the peak stays at , the limit plus the delay overshoot. Hiccup then cuts the average to , so nothing overheats however long the short lasts. A boost has no such defence: its diode connects input to output directly, so a short on its output is fed straight from the input. Boost converters therefore need an input fuse, an eFuse or a disconnect switch (The Boost Converter).
Desaturation detection in IGBT and SiC bridges
In a motor drive or an inverter on a high-voltage bus, a shoot-through or a phase-to-phase short drives thousands of amperes through two switches. An IGBT limits the current itself (it desaturates: its collector voltage rises towards the bus as the current exceeds what the gate voltage allows), but it dissipates , about in a small module, and survives only its rated short-circuit withstand time, typically to for industrial IGBTs and often to for SiC MOSFETs (IGBTs, SiC and GaN). The gate driver must detect the fault and switch off within that time.
The DESAT circuit uses the switch as its own sensor. While the switch is on and healthy, the high-voltage diode conducts and holds the pin at plus a diode drop, a few volts. In a short circuit rises, the diode blocks, and the driver's current source charges the blanking capacitor; when it reaches the threshold the driver acts. The capacitor sets the blanking time, which must be longer than the normal turn-on transient and shorter than the withstand time:
A fast turn-off of through of stray inductance in would add to the bus at the device; so drivers turn off a fault softly, through a larger resistor or a controlled gate ramp over about ( overshoot), then latch a fault for the controller. For SiC, with its shorter withstand time, the blanking is shortened, or the current is measured directly with a sense-emitter or shunt. All of this is high-voltage equipment: calculation and simulation only here.
Voltages: UVLO, OVP and soft start
- Undervoltage lockout (UVLO) keeps the converter off until its input and its gate-drive supply are high enough: a MOSFET driven by instead of sits in its linear region and overheats (Power MOSFETs). It has hysteresis so that the input's own drop at start-up does not make it chatter.
- Overvoltage protection (OVP) stops switching when the output exceeds its limit, for example after a broken feedback resistor; a crowbar (a thyristor across the output that blows a fuse) is the last resort when the switch itself has failed short.
- Overtemperature shutdown with hysteresis, from a sensor near the hottest part.
- Soft start ramps the reference so that the output capacitor charges with a controlled current . Without it the output overshoots and the inductor current reaches the current limit at every start (The Switching Cell).
Interactive: soft start, or not
An averaged buck (the switch node as a source, see Averaged Models) with , effective and a load, twice: circuit A starts with a step to , circuit B ramps over . The lab shows the step's inductor current peaking at at and its output overshooting to at ; the ramp's inductor current never exceeds and its output peaks at . (A real controller would clip the first case at its limit, so it would charge more slowly but still overshoot.)
Inrush at the input: hot-plugging
Plugging a live cable into a board with only ceramic input capacitors forms an almost undamped circuit from the cable's inductance and the capacitors: the current surges to tens of amperes and the voltage at the board rings up to nearly twice the supply. The ngspice deck compares of ceramics alone with the same plus a electrolytic whose ESR damps the ring.
cat > hotplug.cir <<'EOF'
* Hot-plugging a 24 V supply into a converter's input: 1 m of cable (1 uH, 50 mohm)
* A: 3 x 10 uF ceramic only (ESR 5 mohm) B: the same plus 100 uF electrolytic (ESR 0.3 ohm)
VS s 0 PULSE(0 24 10u 50n 50n 1 2)
LA s a1 1u
RA a1 a 50m
CA a ca 30u
RCA ca 0 5m
LB s b1 1u
RB b1 b 50m
CB b cb 30u
RCB cb 0 5m
CE b ce 100u
RCE ce 0 0.3
.control
tran 10n 200u 0 10n
meas tran vA_max max v(a)
meas tran iA_max max i(LA)
meas tran vB_max max v(b)
meas tran iB_max max i(LB)
.endc
.end
EOF
ngspice -b hotplug.cir 2>&1 | grep -E '^(va_max|ia_max|vb_max|ib_max) +='va_max = 3.887628e+01 at= 2.728500e-05
ia_max = 1.058853e+02 at= 1.789500e-05
vb_max = 2.783048e+01 at= 2.888500e-05
ib_max = 1.182625e+02 at= 1.950500e-05
With ceramics only the input rings to , beyond a part's rating, from a supply; the damped version peaks at . Both draw over for a few microseconds, far too fast for the supply's current limit, which acts in milliseconds; the energy comes from the supply's own output capacitor and the cable. Cures: a damping electrolytic, an inrush-limiting NTC thermistor, or a hot-swap controller or eFuse, a MOSFET in series with the input whose gate ramps slowly and which also limits current and trips on faults.
Derating and reliability
Derating means using parts below their maximum ratings, with margins that come from a company's or a customer's rules (aerospace and automotive rules are strictest). Typical figures: semiconductor voltage at most to of its rating including ringing, junction temperature at most to for a or part, ceramic and film capacitors at to of rated voltage (solid tantalum ), resistors at to of rated power. The worst case is taken over input voltage, load, ambient temperature and tolerances.
Three calculations recur:
- Capacitor life. An aluminium electrolytic's life roughly doubles for every below its rated temperature, with its own ripple heating added: .
- Failure rates. Constant-rate failures are counted in FIT (failures per device-hours); a series system's rates add, hours. Rates come from handbooks (MIL-HDBK-217F Notice 2 of 1995, still the latest; Telcordia SR-332 Issue 4, 2016; Siemens SN 29500; IEC TR 63162:2025, with IEC 61709:2017 supplying the stress models that convert them to your operating conditions; as of 2026-11) or from the manufacturers' qualification data, and depend on temperature roughly as the Arrhenius law .
- Power cycling. Bond wires and solder layers of power modules fatigue with each junction temperature swing ; Coffin–Manson-type models give cycles to failure roughly proportional to (the exponent depends on the technology).
import numpy as np
# 1. Soft start: output capacitance (own 30 uF effective + 470 uF on the board it feeds), 12 V
C, V, I_load = 500e-6, 12.0, 2.0
for t_ss in (0.1e-3, 1e-3, 6e-3, 20e-3):
i_c = C * V / t_ss
print(f"soft start {t_ss*1e3:5.1f} ms: charging current {i_c:6.2f} A, "
f"peak with full load {i_c + I_load:6.2f} A")
# 2. Aluminium electrolytic life: doubles for every 10 K below the rated temperature
L0, T_rated = 2000.0, 105.0 # hours at 105 C (a common rating)
I_rip, esr, Rth = 1.0, 0.10, 30.0 # rms ripple A, ESR ohm, core-to-ambient K/W
dT = I_rip**2 * esr * Rth
for Ta in (45, 65, 85):
Tc = Ta + dT
life = L0 * 2 ** ((T_rated - Tc) / 10)
print(f"ambient {Ta} C, core {Tc:.0f} C: life {life:8.0f} h = {life/8760:5.1f} years")
# 3. A failure-rate budget (illustrative FIT values, failures per 1e9 device-hours, at 55 C)
parts = {"controller IC": 20, "MOSFET": 10, "Schottky diode": 5, "inductor": 2,
"ceramic capacitors (6)": 6, "polymer capacitor": 8, "resistors (12)": 6, "connector": 10}
fit = sum(parts.values())
print(f"total {fit} FIT: MTBF {1e9/fit:,.0f} h; probability of failure in 5 years "
f"{100*(1 - np.exp(-fit*1e-9*5*8760)):.2f} %")
k, Ea = 8.617e-5, 0.7 # eV/K, a typical activation energy
af = np.exp(Ea / k * (1 / (55 + 273.15) - 1 / (85 + 273.15)))
print(f"Arrhenius factor 55 C -> 85 C at Ea = 0.7 eV: x{af:.1f}")
# 4. Power cycling of a power module: Coffin-Manson, cycles to failure ~ dTj^-5
for dTj in (40, 60, 80):
print(f"junction swing {dTj} K: {(40/dTj)**5:5.3f} x the cycles at 40 K")soft start 0.1 ms: charging current 60.00 A, peak with full load 62.00 A
soft start 1.0 ms: charging current 6.00 A, peak with full load 8.00 A
soft start 6.0 ms: charging current 1.00 A, peak with full load 3.00 A
soft start 20.0 ms: charging current 0.30 A, peak with full load 2.30 A
ambient 45 C, core 48 C: life 103968 h = 11.9 years
ambient 65 C, core 68 C: life 25992 h = 3.0 years
ambient 85 C, core 88 C: life 6498 h = 0.7 years
total 67 FIT: MTBF 14,925,373 h; probability of failure in 5 years 0.29 %
Arrhenius factor 55 C -> 85 C at Ea = 0.7 eV: x8.0
junction swing 40 K: 1.000 x the cycles at 40 K
junction swing 60 K: 0.132 x the cycles at 40 K
junction swing 80 K: 0.031 x the cycles at 40 K
A soft start keeps the start-up current inside the current limit even with downstream; would need . The electrolytic lasts years at ambient but under one year at : in a hot enclosure it, not the semiconductors, sets the product's life. The illustrative failure-rate budget gives a chance of failure in five years at ; running everything hotter would multiply the rates by about eight. And a module whose junction swings by each cycle lasts about 3 % as many cycles as one swinging by , which is why traction inverters are designed for the temperature swing of every acceleration.
Guided lab: current limit and hiccup at 24 V
Hand calculation. For your buck evaluation board, take , , the controller's minimum on-time and current limit from the datasheets, and compute the rise and fall per cycle in a short as in the worked example. Predict whether the controller needs frequency foldback.
Simulation. Put your values into the first cell and find the frequency at which the current stops ratcheting.
What you would measure. Run the board from a bench supply set to with a limit. Apply the short with a MOSFET switch across the output (driven from a signal generator, on, off), not with a wire, and watch the inductor current with a current probe. Expect the peak to stop at the datasheet's current limit within its stated tolerance (typically to ), plus the small delay overshoot, the switching frequency to drop when the output collapses, and the hiccup pattern if the controller has one, with the average input current falling to a fraction of normal. Then start the board into a load capacitor and measure the soft-start time and inrush.
Hazards and safe setup. At most , current-limited. The shorting MOSFET must be rated for the peak current and mounted on a heatsink; never short the output by hand. Hiccup testing heats the inductor and diode; give them time to cool between runs. Electrolytic capacitors must be installed with the right polarity and voltage rating, and discharged through a resistor afterwards. Desaturation tests on IGBT or SiC bridges are high-voltage, high-energy tests for specialist labs: calculation and simulation only.
Pitfalls
- Relying on the current limit in a short without checking the minimum on-time. The current can ratchet past it.
- Blanking too long or too short. Too long and the device fails before the driver acts; too short and every normal turn-on trips the fault.
- Ceramic-only inputs and hot-plugging. The ring can reach twice the supply voltage.
- Derating at nominal conditions. Margins are checked at the worst corner, including ringing and the hottest ambient.
Practice
- With a minimum on-time, does the shorted buck of the worked example still ratchet at ?
- Choose for a blanking time with and a threshold.
- An electrolytic rated at runs at a core temperature of . Estimate its life.
Answer
- , : the fall wins, so the limit holds.
- (use and check the timing).
- , about years.
Test yourself
Why can a buck's peak current limit fail to hold during a hard output short?
- the comparator is too slow
- the minimum on-time adds more current than the nearly zero off-time voltage removes, so the current ratchets up each cycle
- the diode opens
- the output capacitor discharges into the switch
Desaturation detection protects an IGBT by…
- measuring the gate charge
- sensing that has risen while the device is on, after a blanking time, and turning it off softly within its short-circuit withstand time
- limiting the dead time
- monitoring the heatsink temperature
A board with only ceramic input capacitors is hot-plugged into 24 V through a cable. The input voltage may briefly reach about…
- 24 V
- nearly 48 V, from the lightly damped LC ring
- 12 V
- 0 V
An aluminium electrolytic's life roughly…
- is independent of temperature
- doubles for every 10 K cooler it runs
- halves for every 1 K cooler
- depends only on its voltage