TExcelTAD
Home › Electrical & Electronic Measurements › Measurement Reports and Conformity Decisions

Measurement Reports and Conformity Decisions

A measurement that nobody can read, repeat or rely on is wasted. The report is where the work of the whole course becomes useful to someone else: the model, the method, the traceability of the instruments, the result with its uncertainty, and often a decision: does the item meet its specification? That last step is where uncertainty stops being academic: a reading of 5.045 V5.045\ \text{V} against a limit of 5.050 V5.050\ \text{V} is "inside", but with an uncertainty of ±0.020 V\pm 0.020\ \text{V} there is a fair chance the true value is outside. This lesson covers what a report must contain, how to state results, and how to make conformity decisions with an explicit decision rule. The lab report structure from EE Foundations is the starting point; this is the professional version.

What a report contains

ISO/IEC 17025:2017 (clause 7.8) lists what test and calibration reports must contain. The table follows that list, plus items good practice adds (an equipment list with calibration due dates, an annex with the budget and raw-data location); together they make any engineering measurement report usable:

Part Content
identification title, unique report number, page numbering ("page 2 of 6"), laboratory, client, date of measurement and of issue
item description and identification of the item measured (model, serial number), its condition on receipt
method the procedure (or standard) followed, deviations from it, sampling, the measurement model
equipment and traceability instruments with serial numbers and calibration due dates; a statement of traceability to the SI
conditions environmental conditions that affect the result (temperature, humidity, supply)
results values with units, expanded uncertainty with kk and coverage probability, as tables and graphs
decisions statement of conformity and the decision rule used, if a specification was assessed
authorisation who performed, checked and approved the work
annex the uncertainty budget, raw data location, software and script versions

Results are stated as y=1.52288 A±0.00044 Ay = 1.52288\ \text{A} \pm 0.00044\ \text{A} (k=1.97k = 1.97, about 95 %95\,\%) or y=1.52288(22) Ay = 1.52288(22)\ \text{A} for the standard uncertainty in concise notation. Round UU to one or two significant figures (two when the first is 1 or 2) and the value to the same decimal place, rounding UU up rather than down when it matters.

Conformity decisions

reject inconclusive accept inconclusive reject TL TU 4.90 4.95 5.00 5.05 5.10 value (V); tolerance 5.000 +/- 0.050 V, guard band w = U = 0.020 V y = 5.045 V +/- U: inconclusive

A specification has a tolerance zone, say TLT_L to TUT_U. A measured value yy with standard uncertainty uu leaves the true value uncertain, so a decision can be wrong in two ways: false accept (the item is out of tolerance but passes, the consumer's risk) and false reject (in tolerance but fails, the producer's risk). With a normal distribution the probability that the item conforms is

pc=Φ(TU−yu)−Φ(TL−yu)p_c = \Phi\left(\frac{T_U - y}{u}\right) - \Phi\left(\frac{T_L - y}{u}\right)

(Φ\Phi is the standard normal CDF). Common decision rules (ILAC-G8:09/2019 and JCGM 106:2012 describe them):

  • Simple acceptance (shared risk): pass if yy is inside the tolerance. Acceptable when the uncertainty is small compared with the tolerance (a high TUR, Calibration); near the limits the false-accept risk approaches 50 %50\,\%.
  • Guard banding: pass only if yy lies inside the tolerance shrunk by a guard band ww (often w=Uw = U); fail if outside the tolerance widened by ww; in between, the result is inconclusive (or treated as a fail for safety-critical items). With w=Uw = U and k=2k = 2, the false-accept risk at the acceptance limit is below about 2.5 %2.5\,\%.

The rule must be agreed with the client before the measurement, and the report must say which rule was applied.

Worked example: five readings against a tolerance

Given: a reference output specified as 5.000±0.050 V5.000 \pm 0.050\ \text{V}; measurements with U=0.020 VU = 0.020\ \text{V} (k=2k = 2); readings 5.0125.012, 5.0365.036, 5.0455.045, 5.0555.055 and 5.075 V5.075\ \text{V}.

Find: the probability of conformance of each, and the decision under simple acceptance and under a guard band w=Uw = U.

Solve: u=0.010 Vu = 0.010\ \text{V}. For 5.045 V5.045\ \text{V}: pc=Φ(0.5)−Φ(−9.5)=0.691p_c = \Phi(0.5) - \Phi(-9.5) = 0.691. The guard-banded acceptance zone is 4.9704.970 to 5.030 V5.030\ \text{V}; the rejection zone starts outside 4.9304.930 to 5.070 V5.070\ \text{V}.

python · try it yourself
from scipy.stats import norm

# Specification: 5.000 V +/- 0.050 V. Measurements with expanded uncertainty U (k = 2).
lo, hi = 4.950, 5.050
U = 0.020
u = U / 2
w = U                                      # guard band equal to U: accept only inside [lo + w, hi - w]
print(f"tolerance {lo:.3f} .. {hi:.3f} V, U = {U:.3f} V (k = 2), guard-banded acceptance {lo + w:.3f} .. {hi - w:.3f} V")
for y in (5.012, 5.036, 5.045, 5.055, 5.075):
    p = norm.cdf(hi, y, u) - norm.cdf(lo, y, u)            # probability the true value is within tolerance
    simple = "pass" if lo <= y <= hi else "fail"
    guard = "pass" if lo + w <= y <= hi - w else ("fail" if (y < lo - w or y > hi + w) else "inconclusive")
    print(f"y = {y:.3f} V: P(conform) = {100 * p:5.1f} %, simple acceptance: {simple:4s}, guard band: {guard}")
tolerance 4.950 .. 5.050 V, U = 0.020 V (k = 2), guard-banded acceptance 4.970 .. 5.030 V
y = 5.012 V: P(conform) = 100.0 %, simple acceptance: pass, guard band: pass
y = 5.036 V: P(conform) =  91.9 %, simple acceptance: pass, guard band: inconclusive
y = 5.045 V: P(conform) =  69.1 %, simple acceptance: pass, guard band: inconclusive
y = 5.055 V: P(conform) =  30.9 %, simple acceptance: fail, guard band: inconclusive
y = 5.075 V: P(conform) =   0.6 %, simple acceptance: fail, guard band: fail

Check: simple acceptance passes 5.045 V5.045\ \text{V} although there is a 31 %31\,\% chance it is out of tolerance, and fails 5.055 V5.055\ \text{V} although there is a 31 %31\,\% chance it is in: the two cases are mirror images about the limit, as they should be. The guard band refuses to decide for both, and only the clear cases get a pass or fail. Reducing UU (a better method) is the only way to shrink the inconclusive zone.

Writing the result section well

  • Give the measurand precisely ("DC voltage between TP3 and GND at 23±1 ∘C23 \pm 1\,^\circ\text{C}, 5.0 V5.0\ \text{V} input, no load"), not just "output voltage".
  • Put the uncertainty budget in an annex as a table with a share column (GUM Budgets), and say how it was checked (for example by Monte Carlo).
  • Plot data with error bars and the specification limits; show residuals for any fit.
  • State corrections applied (loading, offsets, calibration corrections) and their uncertainties.
  • Separate observations from interpretations: "En=1.4E_n = 1.4" is an observation; "the second meter is probably out of calibration" is an interpretation and should be labelled so.

Guided lab: write the report for one of your measurements

Hand calculation. Take one measurement from an earlier lab in this course (the shunt current, the four-wire resistance, the thermocouple). Write its model, the budget, UU with kk, and decide conformity with a tolerance you set beforehand (for example the component's datasheet tolerance).

Simulation. Run the decision program with your own tolerance, UU and reading; then shrink UU by half and see the inconclusive zone narrow.

What you would measure. Re-measure the item with the procedure written in your report, ideally by someone else, and compare with EnE_n (Introduction). A report that lets another person get an overlapping interval is the milestone of this course.

Hazards and safe setup. The same as the lab you re-run: current-limited, low-voltage bench work only.

Pitfalls

  • A result without kk or coverage probability.
  • A conformity statement without the decision rule, or a rule chosen after seeing the data.
  • Too many digits in UU (three or more) or a value rounded more coarsely than its uncertainty.
  • Reports that cannot be traced to raw data, instruments and script versions.

Practice

  1. Round y=12.34567 mAy = 12.34567\ \text{mA}, U=0.03847 mAU = 0.03847\ \text{mA} correctly.
  2. A tolerance is 100.0±1.0 Ω100.0 \pm 1.0\ \Omega, a reading 100.9 Ω100.9\ \Omega with U=0.4 ΩU = 0.4\ \Omega (k=2k = 2). Decide with simple acceptance and with a guard band w=Uw = U.
Answer
  1. U=0.038 mAU = 0.038\ \text{mA} (two significant figures), y=12.346 mAy = 12.346\ \text{mA}: 12.346±0.038 mA12.346 \pm 0.038\ \text{mA} (k=2k = 2).
  2. Simple acceptance: pass (100.9≤101.0100.9 \le 101.0). Guard band: acceptance zone 99.499.4 to 100.6 Ω100.6\ \Omega, rejection beyond 98.698.6 and 101.4 Ω101.4\ \Omega: inconclusive. pc=Φ(0.5)=69 %p_c = \Phi(0.5) = 69\,\%.

Test yourself

A false accept is

  1. rejecting a good item
  2. accepting an item whose true value is out of tolerance
  3. a measurement with no uncertainty
  4. a calibration error

Under simple acceptance, a reading exactly at the upper limit has a probability of conformance of about

  1. 100 %
  2. 95 %
  3. 50 %
  4. 0 %

When must the decision rule be chosen?

  1. after seeing the result
  2. before the measurement, agreed with the client
  3. only if the result fails
  4. never; reports only give values

Which part is required for a calibration result to be useful?

  1. the expanded uncertainty with its coverage factor
  2. a photograph of the instrument
  3. the operator's name only
  4. the price of the calibration