Coordination and Grading
A fault on a branch circuit is seen by every protective device between it and the source: the branch fuse, the sub-board feeder breaker, the main incomer, the transformer's HV relay. All of them see a current far above their pickup. Coordination (selectivity, discrimination) arranges their settings so that only the device nearest the fault trips, and each upstream device waits long enough to act as backup only if the one below it fails. This lesson grades the relays of LV board B1 and shows the tools: time grading, current grading, and the time–current coordination plot.
Safety: a coordination study is paperwork and simulation. Changing settings on live switchgear, and secondary-injection testing, are done by authorised staff under a permit. The bench exercise uses miniature fuses on a current-limited supply.
Three ways to discriminate
Time grading. Every device sees the fault; the downstream one is set faster. The upstream relay must wait for the downstream breaker to open plus margins for its own errors. The grading margin between two relays at the maximum current both see is commonly
for example breaker + relay overshoot + timing errors of the two relays + safety. Numerical relays and fast vacuum breakers allow the low end; electromechanical relays and fuses the high end.
Current grading. The fault current falls with distance from the source because the impedance grows. An instantaneous element set above the largest fault at the far end of its zone cannot see past it. This works well across a transformer (its impedance makes a large step in fault current) and poorly along short low-impedance cables.
Inverse-time grading combines both: IDMT curves let the delay shrink automatically as faults move toward the source, where the current is higher.
Fuses discriminate when the downstream fuse's total is below the upstream fuse's pre-arcing . IEC 60269 gG fuses of one make are typically selective at a rated-current ratio of to ; between makes, compare published values.
The B1 study
The fault currents use the B1 impedance at (Protection Principles) plus the cable, at , with . All three relays use the IEC standard inverse curve (IDMT Curves).
Worked example: grading R3, R2 and R1
Given: R3 (feeder, CT 400/1) ( times the CT rating), TMS . The pickup sits between the feeder's maximum demand, (Mini Project), and the continuous rating of the cable (about to clipped direct or in free air, less in conduit, buried or grouped; IEC 60364-5-52), so R3 protects the cable against overload as well (, IEC 60364-4-43). A pickup set only for fault grading, say , would leave the cable unprotected against overload. R2 (incomer, CT 1600/1) . R1 (HV, CT 100/1) at . Grading margin . F2 at DB1: . F1 at the busbar: , which is at .
Find: the TMS of R2 and R1.
Solve: grade each pair at the largest current both relays see, the fault just downstream of the lower relay.
R2 gets , one step above the minimum , so that R3's TMS can later be raised to grade with DB1's own outgoing devices without regrading R2 and R1.
Check: the TMS of tried for R1 in the previous lesson ( at F1) would have raced R2's with only to spare, too little. The R1 instantaneous element at is referred to , above the largest LV fault, so current grading across the transformer is preserved. The price of time grading shows at F1: a busbar fault is cleared in plus the breaker time, and the upstream backup takes . Faster busbar clearance needs unit protection (Differential Protection) or a zone-selective interlocking signal from R3 to R2.
In Python: the coordination plot
All curves are drawn on one current axis referred to , as coordination software does, so R1's currents are multiplied by .
import numpy as np
import matplotlib.pyplot as plt
def si(I, Is, tms):
M = np.asarray(I, dtype=float) / Is
return np.where(M > 1, tms * 0.14 / (M**0.02 - 1), np.inf)
n = 11 / 0.4 # refer 11 kV currents to 400 V
Zb = complex(1.642e-3, 10.106e-3)
Zc = 0.1 * complex(0.193, 0.080)
IF1 = 23.68e3
IF2 = 1.05 * 400 / np.sqrt(3) / abs(Zb + Zc)
relays = {"R3 feeder": (250, 0.10), "R2 incomer": (1600, 0.15), "R1 HV": (70 * n, 0.30)}
print(f"IF2 = {IF2/1e3:.2f} kA, IF1 = {IF1/1e3:.2f} kA")
for name, (Is, tms) in relays.items():
print(f"{name:10s}: t(F2) = {float(si(IF2, Is, tms)):.3f} s, t(F1) = {float(si(IF1, Is, tms)):.3f} s")
t = {k: [float(si(I, *v)) for I in (IF2, IF1)] for k, v in relays.items()}
print(f"margin R2-R3 at F2: {t['R2 incomer'][0] - t['R3 feeder'][0]:.3f} s")
print(f"margin R1-R2 at F1: {t['R1 HV'][1] - t['R2 incomer'][1]:.3f} s")
I = np.logspace(np.log10(300), np.log10(4e4), 400)
fig, ax = plt.subplots(figsize=(6, 4))
for name, (Is, tms) in relays.items():
ax.loglog(I, si(I, Is, tms), label=name)
ax.loglog([1200 * n, 4e4], [0.04, 0.04], "k:", label="R1 instantaneous")
for x, lab in [(IF2, "F2"), (IF1, "F1")]:
ax.axvline(x, ls="--", c="grey"); ax.text(x * 1.03, 30, lab)
ax.set_xlabel("fault current referred to 400 V (A)"); ax.set_ylabel("time (s)")
ax.set_ylim(0.02, 100); ax.grid(True, which="both", alpha=0.3); ax.legend(fontsize=8)
ax.set_title("B1 coordination, IEC standard inverse"); fig.tight_layout()
plt.show()IF2 = 8.76 kA, IF1 = 23.68 kA
R3 feeder : t(F2) = 0.190 s, t(F1) = 0.147 s
R2 incomer: t(F2) = 0.607 s, t(F1) = 0.379 s
R1 HV : t(F2) = 1.365 s, t(F1) = 0.816 s
margin R2-R3 at F2: 0.417 s
margin R1-R2 at F1: 0.437 s
On the plot the curves never cross over the current range they share: that is the visual test of coordination. Curves that converge at high current (as SI curves with different pickups do) are graded at the highest current; curves that converge at low current would need checking there too.
The transformer complicates earth faults
B1's transformer is Dyn11. A single-phase-to-earth fault on the star side appears on the delta side as current in two lines, each of what a three-phase fault of the same LV current would show. R1 therefore sees an LV earth fault as a smaller multiple and trips more slowly, which helps grading but means R1 is a weak backup for LV earth faults. The zero-sequence current does not pass the delta at all, so an HV earth-fault relay (51N) never sees LV earth faults and can be set low and fast. Sequence Networks explains why.
Guided lab: discrimination between two fuses
Hand calculation. Put a and a fast-acting glass fuse in series (ratio ). From their datasheet values, check that the fuse's total is below the fuse's pre-arcing .
Simulation. Fit both datasheet curves in the Python cell (replace si by your fits) and plot them; they must not cross over the test currents.
What you would measure. From a bench supply in constant-voltage mode (current limit ) through a , resistor (, five times the small fuse), close the circuit: only the fuse should open, in tens of milliseconds. Then try the pair and (ratio ): now either may blow, which is the point of a minimum ratio. Expect scatter from fuse to fuse of tens of percent; test several of each.
Hazards and safe setup. and current-limited only; hot resistor; safety glasses for glass fuses.
Pitfalls
- Grading at the wrong current. Check each pair at the maximum fault current both see, not at the fault at the lower relay's terminals only.
- Forgetting minimum faults. Check that every relay still picks up for the smallest fault in its zone, including arcing faults and the far end of the longest cable with hot conductors.
- Ignoring the transformer connection. Delta–star transformers change how earth and phase-to-phase faults appear on the other side.
- Too many stages. Each stage adds ; with five stages the source end waits more than for its own busbar faults.
Practice
- With a margin instead of , what TMS does R2 need?
- What is R1's operating time for F1 if R2 fails, and what clears F2 if R3 and R2 both fail?
- Why is an instantaneous element on R3 hard to set selectively against the sub-board DB1's own outgoing breakers?
Answer
- ; at one TMS unit gives , so : the already chosen still suffices (margin ).
- R1 trips F1 in ; it also clears F2 as last-resort backup in , disconnecting the whole site.
- A fault just downstream of DB1's outgoing breakers draws nearly the same current as a fault at DB1 itself (only a short cable lies between), so there is no current step for current grading.
Test yourself
A typical grading margin between two numerical relays with vacuum breakers is about…
- 0.02 s
- 0.25 to 0.4 s
- 2 s
- 5 s
Current grading works best…
- along short cables of negligible impedance
- across a transformer, whose impedance makes a large step in fault current
- between parallel feeders
- for earth faults in IT systems
At which current are two IDMT relays graded?
- their pickup currents
- the maximum fault current that both relays see
- the full-load current
- the minimum earth-fault current
Why does an HV earth-fault relay on a Dyn11 transformer not see LV earth faults?
- the CTs saturate
- zero-sequence current cannot flow through the delta winding's lines
- the LV neutral is unearthed
- the transformer impedance is too high