A short circuit on the 400 V400\ \text{V} board of a factory can draw more than 20 kA20\ \text{kA}. Left alone for a second, that current melts busbars, starts fires and drags the voltage down for every other customer on the feeder. Protection exists to find the faulted part and disconnect only that part, within tens or hundreds of milliseconds, while the rest of the system keeps running. This lesson sets out the vocabulary every later protection lesson uses: the qualities a scheme must have, zones of protection, the circuit breakers that interrupt the current, and the current and voltage transformers that let a relay see a fault it could never touch directly.

Safety: everything in this lesson is at mains or medium voltage and is studied by calculation and simulation only. Protection testing on real switchgear needs approved test sets, permits and qualified supervision. The only bench work is a signal-level current transformer driven from a function generator.

What protection must do

Quality Meaning What goes wrong without it
Selectivity (discrimination) trip the smallest part of the system that clears the fault a fault on one motor blacks out the whole plant
Speed clear before damage, instability or fire conductors overheat (I2tI^2 t), generators lose synchronism
Sensitivity detect the smallest fault it must clear (high-resistance earth faults, faults at the far end) a fault smoulders undetected
Stability (security) do not trip for faults outside its zone, inrush, load swings nuisance trips, cascading outages
Dependability trip every time it should one failed relay leaves a fault on

Dependability and security pull against each other: adding a second relay in "one-out-of-two" logic makes a trip more certain but a false trip more likely. Transmission schemes therefore duplicate everything (main 1, main 2) and use separate batteries and trip coils.

Zones of protection

The system is divided into zones: a generator, a transformer, a busbar, a line, a motor. Each zone is bounded by circuit breakers and by the CTs that measure its current. Neighbouring zones overlap around every breaker, so that no point (in particular the short piece between a CT and its breaker) is left unprotected.

~11 kV CB1 T 1000 kVA11/0.4 kV, z = 6 % CB2 400 V bus CB3 to DB1 transformer zone busbar zone feeder zone

Main and backup. Every zone has a main protection. If its relay, CT or breaker fails, backup protection further upstream must clear the fault, more slowly and with a larger outage. Local backup is a second relay or a breaker-failure scheme that trips the adjacent breakers if the current does not stop about 150150 to 250 ms250\ \text{ms} after a trip command; remote backup is the time-delayed protection of the next zone upstream (Coordination and Grading).

Unit and non-unit protection. Unit protection compares quantities at the boundaries of its zone and is inherently selective (Differential Protection). Non-unit protection measures at one end only, so its reach is fuzzy and selectivity must come from time delays or impedance settings (Overcurrent, Distance).

Circuit breakers

A breaker must carry rated current, make onto a fault (close against the peak ipi_p with its electromagnetic forces) and break the fault current. AC breakers interrupt at a current zero: the contacts part, an arc forms, and the medium (vacuum at medium voltage, SF6_6 or newer low-GWP gases at high voltage, air in LV air and moulded-case breakers) must regain dielectric strength faster than the transient recovery voltage rises across the gap. Ratings in IEC 62271-100:2021 (high-voltage AC breakers) include the rated short-circuit breaking current (for example 2525, 31.531.5, 4040, 5050, 63 kA63\ \text{kA}), the making current (2.52.5 times the breaking current at 50 Hz50\ \text{Hz}), the DC time constant (45 ms45\ \text{ms} standard) and the operating sequence O–0.3 s–CO–3 min–CO. LV breakers follow IEC 60947-2 (industrial ACBs and MCCBs: IcuI_{cu}, IcsI_{cs}, IcwI_{cw}) and IEC 60898-1 (household MCBs, type B, C, D magnetic trips at 33–55, 55–1010, 1010–2020 times rated current). Typical total clearing times: 4040–60 ms60\ \text{ms} for a transmission breaker, 1010 ms or less for a current-limiting MCB, a few cycles for an ACB.

Instrument transformers for protection

A relay cannot be wired to a 23 kA23\ \text{kA} busbar. Current transformers scale the primary current to 1 A1\ \text{A} or 5 A5\ \text{A} nominal; voltage transformers give 100100 or 110 V110\ \text{V} line-to-line. Both isolate the relay circuit from the primary. Their construction and metering classes are in Autotransformers and Instrument Transformers; protection adds one demand: a CT must stay accurate at many times rated current.

IEC 61869-2:2012 writes a protection CT as, for example, 15 VA15\ \text{VA} 5P20: at its rated burden (15 VA15\ \text{VA}) the composite error stays below 5 %5\ \% up to 2020 times rated current (the accuracy limit factor, ALF). The CT's secondary must develop E=Is(Rct+Rb)E = I_s (R_{ct} + R_b), where RctR_{ct} is its own winding resistance and RbR_b the burden of leads and relay. If the actual burden is smaller than rated, the CT can go further before it saturates:

ALFeff=ALF Rct+Rb,ratedRct+Rb,actual\text{ALF}_\text{eff} = \text{ALF}\,\frac{R_{ct} + R_{b,\text{rated}}}{R_{ct} + R_{b,\text{actual}}}

Fault currents carry a decaying DC offset (Symmetrical Faults). The DC component builds up flux in the core far more than the AC one: in the worst case the CT needs about (1+X/R)(1 + X/R) times the symmetrical voltage to avoid saturation. A saturated CT delivers short, spiky pulses; overcurrent relays only trip late, but differential relays may trip falsely, which is why their CTs are sized with this factor.

Never open-circuit a CT secondary while primary current flows: all the primary ampere-turns then magnetise the core, the secondary voltage spikes to kilovolts and the core overheats. Short the secondary with test links before removing a relay.

Worked example: the B1 incomer CT

Given: LV board B1 (11/0.4 kV, 1000 kVA, z=6 %z = 6\ \%, X/R=6X/R = 6, upstream fault level 250 MVA250\ \text{MVA}). The board's maximum three-phase fault current with the IEC 60909 voltage factor c=1.05c = 1.05 is Ik=23.68 kAI_k = 23.68\ \text{kA}, X/R=6.16X/R = 6.16 (computed in the Python cell below). Incomer CT 1600/1, 15 VA15\ \text{VA} 5P20, Rct=4.0 ΩR_{ct} = 4.0\ \Omega; leads 2×10 m2 \times 10\ \text{m} of 2.5 mm22.5\ \text{mm}^2 copper (7.41 mΩ/m7.41\ \text{m}\Omega/\text{m}); relay burden 0.1 Ω0.1\ \Omega.

Find: the secondary fault current, the effective ALF, and whether the CT saturates for a fully offset fault.

Solve:

Is=23 680 A1600=14.80 A,Rb=2⋅10 m⋅7.41 mΩ/m+0.1 Ω=0.248 ΩALFeff=20⋅4.0+154.0+0.248=89.4Esym=14.80 A⋅4.248 Ω=62.9 V,Eoffset≈(1+6.16)⋅62.9 V=450 V\begin{aligned} I_s &= \frac{23\,680\ \text{A}}{1600} = 14.80\ \text{A}, \qquad R_b = 2 \cdot 10\ \text{m} \cdot 7.41\ \text{m}\Omega/\text{m} + 0.1\ \Omega = 0.248\ \Omega \\ \text{ALF}_\text{eff} &= 20 \cdot \frac{4.0 + 15}{4.0 + 0.248} = 89.4 \\ E_\text{sym} &= 14.80\ \text{A} \cdot 4.248\ \Omega = 62.9\ \text{V}, \qquad E_\text{offset} \approx (1 + 6.16) \cdot 62.9\ \text{V} = 450\ \text{V} \end{aligned}

The CT's accuracy limit EMF is 20⋅1 A⋅(4+15) Ω=380 V20 \cdot 1\ \text{A} \cdot (4 + 15)\ \Omega = 380\ \text{V}.

Check: the symmetrical fault (14.814.8 times rated) is well inside the effective ALF of 8989, so the CT reproduces the steady fault current. A fully offset fault needs about 450 V450\ \text{V}, more than 380 V380\ \text{V}, so the CT may saturate for part of the first cycles. That is harmless for a time-delayed overcurrent relay that only needs the current after a few cycles; it would matter for a fast differential scheme. A 1 A1\ \text{A} secondary keeps the lead burden small; the same leads at 5 A5\ \text{A} would be 2525 times the burden in VA.

In Python: fault level, CT check and breaker ratings

python · try it yourself
import numpy as np
U, c = 400.0, 1.05
# B1: grid 250 MVA at 11 kV (X/R = 10), transformer 1000 kVA, z = 6 %, X/R = 6, all referred to 400 V
Zs = U**2 / 250e6; Rs = Zs / np.sqrt(1 + 10**2); Xs = 10 * Rs
Zt = 0.06 * U**2 / 1e6; Rt = Zt / np.sqrt(1 + 6**2); Xt = 6 * Rt
Z = complex(Rs + Rt, Xs + Xt)
Ik = c * U / np.sqrt(3) / abs(Z)
XR = Z.imag / Z.real
kappa = 1.02 + 0.98 * np.exp(-3 / XR)          # IEC 60909 peak factor
ip = kappa * np.sqrt(2) * Ik
print(f"Z = {Z.real*1e3:.3f} + j{Z.imag*1e3:.3f} mOhm, X/R = {XR:.2f}")
print(f"Ik = {Ik/1e3:.2f} kA, kappa = {kappa:.3f}, ip = {ip/1e3:.1f} kA")

# Incomer CT 1600/1, 15 VA 5P20, Rct = 4 Ohm
Is = Ik / 1600
Rb = 2 * 10 * 7.41e-3 + 0.1
alf_eff = 20 * (4.0 + 15.0) / (4.0 + Rb)
E_sym = Is * (4.0 + Rb)
print(f"Is = {Is:.2f} A, burden = {Rb:.3f} Ohm, ALF_eff = {alf_eff:.1f}")
print(f"E needed: {E_sym:.1f} V symmetric, {E_sym*(1+XR):.0f} V with full offset; CT limit {20*1*(4+15):.0f} V")

# Breaker check: an ACB with Icu = 50 kA, making capacity 105 kA (peak)
for name, need, have in [("breaking", Ik/1e3, 50.0), ("making", ip/1e3, 105.0)]:
    print(f"{name}: need {need:.1f} kA, have {have:.0f} kA ->", "OK" if have >= need else "TOO SMALL")
Z = 1.642 + j10.106 mOhm, X/R = 6.16
Ik = 23.68 kA, kappa = 1.622, ip = 54.3 kA
Is = 14.80 A, burden = 0.248 Ohm, ALF_eff = 89.4
E needed: 62.9 V symmetric, 450 V with full offset; CT limit 380 V
breaking: need 23.7 kA, have 50 kA -> OK
making: need 54.3 kA, have 105 kA -> OK

The κ\kappa factor and the voltage factor cc come from IEC 60909-0:2016 (edition 2.0; edition 3.0 followed on 23 July 2026) and are explained in Fault Levels and Breaker Duty. The 105 kA105\ \text{kA} making capacity is the IEC 60947-2 ratio n=2.1n = 2.1 for breaking ratings above 2020 and up to 50 kA50\ \text{kA} (Table 2; current edition IEC 60947-2:2024).

Interactive: a CT's magnetising branch steals current

A CT referred to its secondary is an ideal current source (primary current divided by the ratio) in parallel with the magnetising inductance LmL_m, feeding the winding resistance RctR_{ct} and the burden RbR_b. Here 1 A1\ \text{A} is injected, Lm=10 HL_m = 10\ \text{H} (Xm=3.14 kΩX_m = 3.14\ \text{k}\Omega at 50 Hz50\ \text{Hz}). Slide the burden: at 15 Ω15\ \Omega the relay gets 1.000 A1.000\ \text{A}, shifted 0.3∘0.3^\circ; at 500 Ω500\ \Omega it gets 0.987 A0.987\ \text{A}, shifted 9.1∘9.1^\circ, because more of the source current now flows in LmL_m. The lab sweeps frequency on its plot: read the values at the 50 Hz50\ \text{Hz} cursor. The left of the plot is instructive too: below about 1 Hz1\ \text{Hz} most of the current goes into LmL_m, which is why a slowly decaying DC offset is so hard on a CT. A real core is nonlinear, so once the flux reaches saturation LmL_m collapses and the error becomes far worse than this linear model shows.

0.00.51.0100m1101001k10kf (Hz)|I| (A)|I(RB)||I(LM)|phasors at f = 50.00 Hz (magnitude @ phase)V(n)19.0 V @ 0.3 degV(m)15.0 V @ 0.3 degI(I1)1.00 A @ 0.0 degI(LM)6.05 mA @ -89.7 degI(RCT)1.00 A @ 0.3 degI(RB)1.00 A @ 0.3 deg

Guided lab: a signal-level current transformer

Hand calculation. Take a small current-sense transformer of ratio 1:1000 (a few euros, rated 20 A20\ \text{A} primary, usually with a burden resistor footprint). With 100 mA100\ \text{mA} primary at 50 Hz50\ \text{Hz} and a 100 Ω100\ \Omega burden, expect 100 μA100\ \mu\text{A} secondary and 10 mV10\ \text{mV} across the burden.

Simulation. Put your transformer's measured LmL_m (from an LCR meter on the secondary, primary open) and winding resistance into the netlist lab and predict the ratio error for 100 Ω100\ \Omega, 1 kΩ1\ \text{k}\Omega and 10 kΩ10\ \text{k}\Omega burdens.

What you would measure. Drive the primary (one turn through the core) from a function generator through a 47 Ω47\ \Omega power resistor, set for 100 mA100\ \text{mA} rms (about 4.7 V4.7\ \text{V}; a generator's 50 Ω50\ \Omega output usually cannot drive that much current, so add a small audio amplifier or work at 20 mA20\ \text{mA} and scale the readings), and read the primary current on a DMM and the burden voltage on a second DMM or a scope. Expect the burden voltage to fall by a few percent at 10 kΩ10\ \text{k}\Omega and the waveform to distort if you raise the burden further: that is the knee of the magnetising curve. DMM uncertainty at these levels is about ±1 %\pm 1\ \% of reading, so ratio errors below 1 %1\ \% are not resolvable without a better meter.

Hazards and safe setup. Function-generator levels only: never pass a mains conductor through the sensor. Even at signal level an open-circuited CT secondary can show a surprising voltage spike; keep the burden connected before you power the primary.

Pitfalls

  • Zones with gaps. If both CTs sit on the same side of a breaker, a fault between them is outside both zones and only backup clears it.
  • Breaking current is not the whole rating. Check the making (peak) current and the DC time constant too: a high X/RX/R near generators can exceed the standard 45 ms45\ \text{ms}.
  • CT burden in VA at the wrong current. A "15 VA15\ \text{VA}" rating means 15 Ω15\ \Omega for a 1 A1\ \text{A} CT but only 0.6 Ω0.6\ \Omega for a 5 A5\ \text{A} CT.
  • Open CT secondaries are a lethal voltage hazard and destroy the CT.

Practice

  1. A 5 A5\ \text{A} CT, 10P10, 10 VA10\ \text{VA}, Rct=0.2 ΩR_{ct} = 0.2\ \Omega, drives 2×25 m2 \times 25\ \text{m} of 2.5 mm22.5\ \text{mm}^2 leads and a 0.05 Ω0.05\ \Omega relay. Find its effective ALF.
  2. Why do zones overlap around a breaker rather than meeting at a line?
  3. A busbar's fault level is 38 kA38\ \text{kA} with X/R=14X/R = 14. Is a breaker rated 40 kA40\ \text{kA} with making capacity 100 kA100\ \text{kA} peak enough?
Answer
  1. Rated burden 10/25=0.4 Ω10/25 = 0.4\ \Omega; actual 0.3705+0.05=0.4205 Ω0.3705 + 0.05 = 0.4205\ \Omega; ALFeff=10⋅(0.2+0.4)/(0.2+0.4205)=9.67\text{ALF}_\text{eff} = 10 \cdot (0.2 + 0.4)/(0.2 + 0.4205) = 9.67. Long leads at 5 A5\ \text{A} eat the margin.
  2. So that a fault on the breaker itself, or between a CT and the breaker, lies inside at least one zone. The price is that a fault in the overlap trips both zones.
  3. κ=1.02+0.98e−3/14=1.811\kappa = 1.02 + 0.98e^{-3/14} = 1.811, ip=1.811⋅2⋅38=97.3 kAi_p = 1.811 \cdot \sqrt{2} \cdot 38 = 97.3\ \text{kA}. Breaking (40>3840 > 38) and making (100>97.3100 > 97.3) pass, with little margin; the DC time constant X/(ωR)=44.6 msX/(\omega R) = 44.6\ \text{ms} is just inside the standard 45 ms45\ \text{ms}.

Test yourself

A relay trips for a fault outside its own zone. Which quality has failed?

  1. sensitivity
  2. security (stability)
  3. speed
  4. dependability

What does the marking 15 VA 5P20 on a protection CT mean?

  1. 5 % error up to 15 times rated current
  2. composite error at most 5 % up to 20 times rated current at a 15 VA burden
  3. a 5 A secondary rated for 20 VA
  4. a 20 A secondary

Why is a CT secondary never left open while the primary carries current?

  1. the relay trips
  2. the core saturates and the secondary voltage rises to dangerous levels
  3. the ratio changes sign
  4. the primary current stops

An AC breaker normally interrupts the fault current…

  1. at the instant its contacts part
  2. at a natural current zero, if the gap recovers faster than the TRV rises
  3. only after the DC offset has decayed completely
  4. by inserting a resistor