TExcelTAD
Home › Power Systems: Three-Phase, Generation, Grids & Protection › Distribution Systems: Radial and Ring Feeders, Voltage Drop and Losses

Distribution Systems: Radial and Ring Feeders, Voltage Drop and Losses

Transmission networks are meshed, monitored and few. Distribution networks are the opposite: thousands of medium-voltage feeders and hundreds of thousands of low-voltage circuits, mostly radial, lightly monitored, and designed to keep every customer's voltage within limits at the lowest cost. A large share of all network losses happens here, and so does most of the new rooftop solar and EV charging. This lesson introduces feeder layouts, computes the voltage profile and losses of the course's 11 kV11\ \text{kV} feeder F11 with a backward/forward sweep, and shows how distributed generation turns voltage drop into voltage rise.

Safety: 11 kV11\ \text{kV} and 400 V400\ \text{V} networks are studied here by calculation and simulation only. The bench analogue is a small DC "grid" on a current-limited supply of 12 V12\ \text{V}.

Layouts

radial (feeder F11)open ring 33/11 kV N1N2N3N4 2 km1.521.5 loads 800, 600, 500, 400 kW, pf 0.95 NOP fault: isolate section, close NOP
  • Radial: one path from source to each load. Cheap, simple protection (overcurrent and fuses grade naturally, Coordination), but a fault interrupts everyone downstream until it is repaired.
  • Open ring (open loop): built as a ring, operated radially with a normally open point (NOP). After a fault, switching isolates the faulted section and closes the NOP, restoring supply within minutes (or automatically within seconds with remote-controlled switches). Most urban MV networks in Europe work this way.
  • Closed ring and meshed (city centres, some LV networks): continuous supply through a fault, at the cost of unit protection and higher fault levels.

Reliability is measured with SAIDI (average outage minutes per customer per year) and SAIFI (interruptions per customer per year), defined in IEEE 1366.

Voltage drop and losses

For a section of impedance R+jXR + jX carrying the three-phase power P+jQP + jQ of everything downstream, at line voltage VV, the drop in magnitude is well approximated by

ΔV≈PR+QXV,ΔVV≈PR+QXV2\Delta V \approx \frac{PR + QX}{V}, \qquad \frac{\Delta V}{V} \approx \frac{PR + QX}{V^2}

and the three-phase loss is 3I2R=P2+Q2V2R3I^2R = \frac{P^2 + Q^2}{V^2}R. Losses grow with the square of the load: a feeder at 50 %50\ \% load wastes a quarter of the full-load loss. In a radial feeder the drops add from the source to the end; the exact profile comes from a backward/forward sweep: guess the node voltages, compute load currents, sum them backward to get branch currents, then step forward from the source subtracting ZIZ I drops, and repeat until the voltages stop changing. It converges in a few iterations because radial feeders have no loops.

Voltage budget. EN 50160 (see Power Quality) and national rules keep LV supply voltage within ±10 %\pm 10\ \% of 230 V230\ \text{V}. The distributor shares that band among the primary-substation tap changer (which holds the 11 kV11\ \text{kV} busbar near a setpoint, sometimes with line-drop compensation), the MV feeder drop, the distribution transformer's fixed off-load taps (typically ±2×2.5 %\pm 2 \times 2.5\ \%) and its regulation, and the LV cable drop.

Distribution transformers (1111 or 20 kV20\ \text{kV} to 400 V400\ \text{V}, 5050 to 2500 kVA2500\ \text{kVA}, usually Dyn11, Three-Phase Transformers) run most of the day well below rating, so their no-load (iron) losses, present 8760 hours a year, often cost more than their load losses. In the EU, Ecodesign Regulation (EU) No 548/2014 sets maximum loss levels (a stricter Tier 2 applying from July 2021).

Worked example: feeder F11

Given: feeder F11 from a 33/11 kV33/11\ \text{kV} primary substation whose tap changer holds 11.0 kV11.0\ \text{kV}; conductor z=0.30+j0.35 Ω/kmz = 0.30 + j0.35\ \Omega/\text{km} per phase; sections S–N1 2 km2\ \text{km}, N1–N2 1.5 km1.5\ \text{km}, N2–N3 2 km2\ \text{km}, N3–N4 1.5 km1.5\ \text{km}; loads 800800, 600600, 500500, 400 kW400\ \text{kW} at pf 0.950.95 lagging (Q=0.3287PQ = 0.3287 P).

Find: the voltage drop at N4 (approximate formula), and the loss in the first section.

Solve: downstream totals: P=2.3P = 2.3, 1.51.5, 0.90.9, 0.4 MW0.4\ \text{MW}; Q=0.756Q = 0.756, 0.4930.493, 0.2960.296, 0.131 Mvar0.131\ \text{Mvar}.

ΔVV∣N4≈∑kPkRk+QkXkV2=(2.3⋅0.6+0.756⋅0.7)+(1.5⋅0.45+0.493⋅0.525)+(0.9⋅0.6+0.296⋅0.7)+(0.4⋅0.45+0.131⋅0.525)112 MW⋅Ω/kV2=3.839121=3.17 %Ploss,1≈2.32+0.7562112⋅0.6 Ω MW=29.1 kW\begin{aligned} \frac{\Delta V}{V}\Big|_{N4} &\approx \sum_k \frac{P_k R_k + Q_k X_k}{V^2} \\ &= \frac{(2.3 \cdot 0.6 + 0.756 \cdot 0.7) + (1.5 \cdot 0.45 + 0.493 \cdot 0.525) + (0.9 \cdot 0.6 + 0.296 \cdot 0.7) + (0.4 \cdot 0.45 + 0.131 \cdot 0.525)}{11^2}\ \text{MW}\cdot\Omega/\text{kV}^2 \\ &= \frac{3.839}{121} = 3.17\ \% \\ P_{\text{loss},1} &\approx \frac{2.3^2 + 0.756^2}{11^2} \cdot 0.6\ \Omega\ \text{MW} = 29.1\ \text{kW} \end{aligned}

Check: the exact sweep below gives 3.28 %3.28\ \% (10.64 kV10.64\ \text{kV}) and a total loss of 45.8 kW45.8\ \text{kW} (2.0 %2.0\ \% of the load). The approximation assumes 11 kV11\ \text{kV} everywhere; the true voltage is lower, so currents and drops are a little higher. A 3.3 %3.3\ \% MV drop leaves most of the 10 %10\ \% band for the transformer and LV cables.

In Python: backward/forward sweep, with and without solar

python · try it yourself
import numpy as np
import matplotlib.pyplot as plt

Z = complex(0.30, 0.35) * np.array([2.0, 1.5, 2.0, 1.5])         # section impedances (Ohm)
P = np.array([800, 600, 500, 400]) * 1e3
S_load = (P + 1j * P * np.tan(np.arccos(0.95))) / 3              # per phase (VA)
Vs = 11e3 / np.sqrt(3)

def sweep(S, tol=1e-6):
    V = np.full(4, Vs, complex)
    for it in range(1, 51):
        I = np.conj(S / V)                                         # load currents
        Ib = np.cumsum(I[::-1])[::-1]                              # backward: branch currents
        Vn, prev = np.empty(4, complex), Vs
        for k in range(4):                                         # forward: voltage drops
            prev = prev - Z[k] * Ib[k]; Vn[k] = prev
        if np.max(np.abs(Vn - V)) < tol:
            return Vn, 3 * np.sum(np.abs(Ib)**2 * Z.real), it
        V = Vn

cases = {"full load": S_load,
         "full load + 1 MW PV at N4": S_load - np.array([0, 0, 0, 1e6 / 3]),
         "20 % load + 2 MW PV at N4": 0.2 * S_load - np.array([0, 0, 0, 2e6 / 3])}
x = np.cumsum([0, 2.0, 1.5, 2.0, 1.5])
fig, ax = plt.subplots(figsize=(6, 3.4))
for name, S in cases.items():
    V, loss, it = sweep(S)
    dv = (np.abs(V) / Vs - 1) * 100
    print(f"{name:26s} ({it} it): V(N4) = {abs(V[3])*np.sqrt(3)/1e3:.2f} kV ({dv[3]:+.2f} %), losses = {loss/1e3:.1f} kW")
    ax.plot(x, np.r_[0, dv], "o-", label=name)
ax.axhline(0, c="k", lw=0.8)
ax.set_xlabel("distance from substation (km)"); ax.set_ylabel("voltage deviation (%)")
ax.grid(alpha=0.3); ax.legend(fontsize=8); fig.tight_layout()
plt.show()
full load                  (7 it): V(N4) = 10.64 kV (-3.28 %), losses = 45.8 kW
full load + 1 MW PV at N4  (6 it): V(N4) = 10.84 kV (-1.46 %), losses = 15.4 kW
20 % load + 2 MW PV at N4  (8 it): V(N4) = 11.30 kV (+2.69 %), losses = 50.0 kW

A 1 MW1\ \text{MW} solar plant at the feeder end during a busy afternoon helps: smaller drop and a third of the losses. On a sunny low-load day the power flows backwards and the end of the feeder rises 2.7 %2.7\ \% above the substation, and the losses (50 kW50\ \text{kW}) exceed even the full-load case, because almost 2 MW2\ \text{MW} now travels the whole length of the feeder. If the tap changer was set high to support the morning peak, customers at N4 can exceed the upper limit; that voltage rise, not current, usually limits how much rooftop solar a rural feeder can host. Remedies include inverters absorbing reactive power (volt-var control under IEEE 1547-2018, The Smart Grid) and on-load tap changers in the distribution transformer.

Interactive: a small DC grid

A 12 V12\ \text{V} source feeding four loads (2020, 3030, 4040 and 50 Ω50\ \Omega) through four 0.5 Ω0.5\ \Omega "line" sections: the same radial structure as F11, at bench level. The lab shows 11.3011.30, 10.8810.88, 10.6410.64 and 10.53 V10.53\ \text{V} at the nodes (12.3 %12.3\ \% drop at the end) and 1.404 A1.404\ \text{A} from the source. Lower the end load RD to 10 Ω10\ \Omega and the end voltage falls to 9.19 V9.19\ \text{V}: a heavy load at the far end costs the most voltage.

node voltages (to ground 0)s12.00 Vn111.30 Vn210.88 Vn310.64 Vn410.53 VnetlistV1 s 0 12R1 s n1 0.5RA n1 0 20R2 n1 n2 0.5RB n2 0 30R3 n2 n3 0.5RC n3 0 40R4 n3 n4 0.5RD n4 0 50element currents (node 1 to node 2 through it)V1s>0-1.40 AR1s>n11.40 ARAn1>0565 mAR2n1>n2839 mARBn2>0363 mAR3n2>n3477 mARCn3>0266 mAR4n3>n4211 mARDn4>0211 mA

Guided lab: build the DC feeder

Hand calculation. Solve the DC feeder by the same backward/forward sweep by hand (two iterations are enough) and compare with the lab's node voltages.

Simulation. Use the lab, then put the DC values into the Python sweep (real numbers, Z as resistances, loads as P=V2/RP = V^2/R) and check it gives the same voltages.

What you would measure. Build it on a breadboard-free terminal strip: four 0.5 Ω0.5\ \Omega, 5 W5\ \text{W} resistors as line sections (or lengths of thin wire), 2020 to 50 Ω50\ \Omega, 5 W5\ \text{W} load resistors, a bench supply at 12.0 V12.0\ \text{V} with its current limit at 2.5 A2.5\ \text{A}. Measure the node voltages with a DMM: expect the lab's values within about ±0.1 V\pm 0.1\ \text{V}, mostly from contact resistance at the terminals, which at 0.5 Ω0.5\ \Omega per section is not negligible. A small solar-panel analogue is a second current-limited supply injecting at N4: watch the end voltage rise above the source.

Hazards and safe setup. 12 V12\ \text{V} only, current-limited; resistors get warm (1 W1\ \text{W} in the first section); when back-feeding with a second supply, set its voltage limit no higher than 13 V13\ \text{V} and check neither supply is driven backwards beyond its rating.

Pitfalls

  • Forgetting Q in the drop. On overhead lines XX is comparable to RR, so reactive load contributes a large share of the drop.
  • Using the peak load for losses. Annual energy losses use the loss load factor, much smaller than the peak ratio because losses go with the square of load.
  • Assuming one-way flow. Protection, tap-changer control and voltage limits all change when DG reverses the flow.
  • Ignoring unbalance. LV feeders carry single-phase loads; the neutral current and the most loaded phase set the real drop.

Practice

  1. A 5 km5\ \text{km} section of F11's conductor carries 3 MW3\ \text{MW} at pf 0.90.9 lagging at 11 kV11\ \text{kV}. Estimate the percentage drop.
  2. By what factor do F11's losses change if every load grows by 20 %20\ \%?
  3. Why do ring networks usually run with an open point?
Answer
  1. Q=3tan⁡(arccos⁡0.9)=1.453 MvarQ = 3 \tan(\arccos 0.9) = 1.453\ \text{Mvar}; R=1.5 ΩR = 1.5\ \Omega, X=1.75 ΩX = 1.75\ \Omega; (3⋅1.5+1.453⋅1.75)/121=5.82 %(3 \cdot 1.5 + 1.453 \cdot 1.75)/121 = 5.82\ \%.
  2. About 1.22=1.441.2^2 = 1.44, slightly more because the voltages fall.
  3. Radial operation keeps fault levels lower and lets simple overcurrent protection grade; the ring still provides an alternative path by switching after a fault.

Test yourself

The approximate voltage drop of a feeder section is…

  1. (PX+QR)/V(PX + QR)/V
  2. (PR+QX)/V(PR + QX)/V
  3. P2R/V2P^2R/V^2
  4. QX/PQX/P

If the load on a feeder halves, its I2RI^2R losses become about…

  1. the same
  2. half
  3. a quarter
  4. an eighth

What usually limits rooftop solar on a long rural LV or MV feeder?

  1. fault current
  2. voltage rise at the feeder end during low load and high generation
  3. frequency
  4. harmonic resonance at 50 Hz

In an open-ring MV network, after a cable fault the operator…

  1. leaves all customers off until repair
  2. isolates the faulted section and closes the normally open point
  3. parallels the ring permanently
  4. raises the substation voltage