Thermal, Hydro and Nuclear Generation
Every power system needs plant that can be told what to produce: tomorrow at 18:00 the demand will be about so much, and someone must be sure that enough generators will be running. For most of the twentieth century that meant thermal plants burning coal, oil or gas, hydro plants and nuclear units. They still provide most of the world's electricity and, more importantly for an engineer, most of the inertia, the voltage control and the dispatchable capacity. This lesson gives the electrical engineer's view of them: where the energy comes from, how efficient the conversion is, how fast the plant can change output, and what that means for the grid. Renewables follow in Wind Power and Solar PV.
Safety: power stations, their generators and their switchyards are studied here by calculation only. The bench analogue below uses a current-limited supply or a small hand-cranked generator.
The energy chain
Every conventional plant ends in the same machine, a synchronous generator (Synchronous Machines, Generators on the Grid), turned by a turbine. What differs is how the turbine gets its energy.
| Plant | Energy path | Typical net efficiency | Output change |
|---|---|---|---|
| coal steam plant | fuel → boiler → steam → turbine | to (older subcritical to modern ultra-supercritical) | slow: a few of rating per minute, hours to start cold |
| open-cycle gas turbine (OCGT) | gas → combustion turbine | to | fast: full output in to minutes |
| combined cycle (CCGT) | gas turbine, its exhaust raises steam for a second turbine | to | medium: about an hour from a warm start |
| nuclear (light-water reactor) | fission heat → steam → turbine | to | usually run flat out; some designs load-follow |
| hydro (reservoir) | water head → water turbine | to (water to wire) | very fast: seconds to a minute |
| pumped storage | hydro in reverse to store, then generate | to round trip | very fast |
These ranges are typical published figures as of the mid-2020s and vary with design, size, age and ambient conditions. The steam plants are limited by thermodynamics: a heat engine between a hot source at and a cold sink at can never beat the Carnot efficiency , and real Rankine cycles reach a bit over half of it. Hydro has no such limit, because it converts mechanical energy (water falling through a head) directly.
The numbers an operator uses
Heat rate is the fuel energy per unit of electrical energy, the inverse of efficiency: in MJ/kWh. A CCGT at has a heat rate of . Fuel cost and CO2 per MWh follow directly:
with the fuel price per MWh of fuel energy and the emission factor per MWh of fuel energy (about for natural gas and for hard coal, on the fuel's net calorific value).
Hydro power from flow and net head :
Capacity factor compares a year's energy with what the plant would produce at full output all year: (Storage, Capacity Factor and LCOE).
Worked example: a hydro plant and a CCGT
Given: a hydro plant with net head , flow , water-to-wire efficiency ; a CCGT at efficiency burning gas at an illustrative per MWh of fuel (any currency), emission factor per MWh of fuel.
Find: the hydro output; the CCGT's fuel input, heat rate, fuel cost and CO2 per MWh of electricity.
Solve:
Check: the hydro plant uses per kg of water, so gives of hydraulic power, of which is . The CCGT wastes of heat, mostly to its condenser and stack.
import numpy as np
rho, g = 1000.0, 9.81
def hydro(Q, H, eta=0.90):
return eta * rho * g * Q * H
print(f"hydro: {hydro(80, 120)/1e6:.1f} MW")
for H in (20, 120, 600): # run-of-river, dam, high-head Alpine plant
print(f" head {H:3d} m: flow for 100 MW = {100e6 / (0.90 * rho * g * H):6.1f} m3/s")
fuel_price, co2_gas, co2_coal = 35.0, 0.202, 0.341 # price per MWh of fuel; t CO2 per MWh of fuel
for name, eta, f in (("CCGT", 0.57, co2_gas), ("OCGT", 0.38, co2_gas), ("coal", 0.42, co2_coal)):
print(f"{name}: heat rate {3.6/eta:5.2f} MJ/kWh, fuel cost {fuel_price/eta:5.1f}/MWh_e, CO2 {f/eta:.3f} t/MWh_e")
T_h, T_c = 600 + 273.15, 30 + 273.15 # live steam and condenser, kelvin
print(f"Carnot limit for 600 C steam and a 30 C condenser: {100*(1 - T_c/T_h):.1f} %")
print(f"CCGT at 400 MW: fuel input {400/0.57:.1f} MW, heat rejected {400/0.57 - 400:.1f} MW")hydro: 84.8 MW
head 20 m: flow for 100 MW = 566.3 m3/s
head 120 m: flow for 100 MW = 94.4 m3/s
head 600 m: flow for 100 MW = 18.9 m3/s
CCGT: heat rate 6.32 MJ/kWh, fuel cost 61.4/MWh_e, CO2 0.354 t/MWh_e
OCGT: heat rate 9.47 MJ/kWh, fuel cost 92.1/MWh_e, CO2 0.532 t/MWh_e
coal: heat rate 8.57 MJ/kWh, fuel cost 83.3/MWh_e, CO2 0.812 t/MWh_e
Carnot limit for 600 C steam and a 30 C condenser: 65.3 %
CCGT at 400 MW: fuel input 701.8 MW, heat rejected 301.8 MW
Coal's fuel is usually cheaper per MWh than gas, so its cost line (computed at the gas price) only shows the effect of efficiency; the CO2 figure shows why coal plants are being closed where carbon is priced.
What the grid gets from these plants
- Inertia. Each large turbine-generator stores kinetic energy in its rotor ( to on its own rating). When a unit trips, the others slow down slightly and release that energy, which buys time for controls (Frequency Control).
- Governor response (primary control): steam valves and hydro gates open in seconds when the frequency falls.
- Reactive power and voltage control from the excitation system (Generators on the Grid).
- Fault current: synchronous machines give several times their rated current into a short circuit for long enough for protection to detect it (Symmetrical Faults).
- Limits: minimum stable generation (a coal unit perhaps to of its rating), ramp rates, minimum up and down times and start-up costs, which drive Unit Commitment.
Nuclear units add one more constraint: after shutdown the fuel still produces decay heat, a few percent of full thermal power at first, falling over days, which is why their cooling must never lose its power supply.
Interactive: a source with internal loss
A generator is a source with internal impedance. The DC lab shows the trade-off at bench scale: a source with into delivers at , into the load at efficiency. Maximum power transfer () would deliver more power at only efficiency: no power station works near that point. Its generator's internal impedance is small compared with the load it serves, so the terminal voltage stays near its rated value.
Guided lab: the efficiency chain of a small generator
Hand calculation. A hand-cranked generator (a small permanent-magnet DC motor with a crank, rated a few watts) feeds a resistor. If you crank at a steady rate that gives , the electrical output is .
Simulation. Set the DC lab to , (a plausible small generator) and ; read the efficiency () and compare with your estimate of the crank effort.
What you would measure. Voltage and current with two DMMs; estimate mechanical input from the crank torque (a spring balance at a known crank radius) times the angular speed (count turns over 10 s). Expect an overall mechanical-to-electrical efficiency of only to for a toy generator (friction and copper loss), with an uncertainty of in the mechanical estimate, a reminder of why large machines with efficiencies above are such engineering achievements.
Hazards and safe setup. Low voltage only; clamp the generator to the bench, keep fingers and hair clear of gears, and never back-drive it from a power supply set above its rating.
Pitfalls
- Gross versus net output. A station's own auxiliaries (pumps, fans, mills) take several percent of the generator output; efficiencies and capacities should say which one they use.
- Lower versus higher heating value. Efficiencies quoted on the fuel's net (lower) calorific value are higher than on the gross value, by about of the value for coal and for natural gas (a LHV CCGT is about HHV).
- Prices and emission factors change. Treat the figures above as illustrations dated to the mid-2020s, not as current market data.
Practice
- A run-of-river plant has a head of and . What flow gives ?
- A coal unit has a heat rate of . What is its efficiency?
- Why are hydro units valuable for frequency control even when water is scarce?
Answer
- .
- .
- They can change output from zero to full in about a minute with little efficiency penalty, so they can respond to disturbances and follow fast changes, using little energy over a day.
Test yourself
A CCGT has an efficiency of 60 %. Its heat rate is…
- 3.6 MJ/kWh
- 6.0 MJ/kWh
- 2.16 MJ/kWh
- 10 MJ/kWh
A hydro plant with 50 m head and 100 m3/s at 90 % efficiency produces about…
- 4.4 MW
- 44 MW
- 441 MW
- 49 MW
Which plant type is normally slowest to change its output?
- reservoir hydro
- open-cycle gas turbine
- coal steam plant
- pumped storage
Why can no steam plant reach 100 % efficiency?
- Generators are lossy
- The second law limits any heat engine to the Carnot efficiency
- Steam is incompressible
- Transformers lose energy