Home › Power Systems: Three-Phase, Generation, Grids & Protection › Fuses, Overcurrent Relays and IDMT Curves

Fuses, Overcurrent Relays and IDMT Curves

The simplest fact about a fault is that it draws more current than any load. Overcurrent protection uses exactly that: trip when the current is too large, and trip faster the larger it is. A fuse does it with a melting element; a relay does it with a CT, a measuring element and a curve. This lesson covers both, and the standard inverse-time curves of IEC 60255-151 that relays use, so that the next lesson can grade them against each other.

Safety: the currents here are mains and medium-voltage fault currents and are studied by calculation only. Fuse and relay testing on real installations needs secondary-injection test sets and qualified staff. The bench exercise uses a 100 mA100\ \text{mA} glass fuse on a current-limited 12 V12\ \text{V} supply.

Fuses

A fuse is a calibrated weak link: a silver or copper element with notches, in a sand-filled ceramic body. Overcurrent heats the notches until they melt (the pre-arcing time), an arc forms and the sand quenches it (the arcing time). Large fault currents melt the element within the first quarter-cycle, before the prospective peak is reached: the fuse is current-limiting, and the downstream equipment sees a much smaller cut-off current and let-through energy I2tI^2 t than the prospective fault.

IEC 60269 (low-voltage fuses) gives each fuse a utilisation category: gG is general purpose, full-range breaking (cables and feeders); aM is partial-range, for motor circuits whose overload is handled elsewhere. Manufacturers publish time–current curves (pre-arcing time against prospective rms current, on log–log axes) and I2tI^2 t values. The conventional limits for a gG fuse of In≥16 AI_n \ge 16\ \text{A} are a non-fusing current of 1.25In1.25 I_n and a fusing current of 1.6In1.6 I_n within the conventional time (1 hour for In≤63 AI_n \le 63\ \text{A} up to 4 hours for large fuses).

Fuses are cheap, fast and need no CT or battery, but they act once, cannot be set, and a single blown fuse in a three-phase motor circuit leaves the motor single-phasing.

Overcurrent relays

A relay compares the CT secondary current with a pickup (setting) current IsI_s. Two elements, with the ANSI device numbers that appear on every drawing:

  • 50, instantaneous: trips with no intentional delay above a high setting, used where the fault current changes a lot along the circuit.
  • 51, inverse-time: trips after a time that falls as the multiple M=I/IsM = I/I_s rises.

Residually connected CTs (the sum of the three phase currents) or a core-balance CT feed 50N/51N earth-fault elements, which can be set well below load current because healthy loads give almost no residual current.

The IEC 60255-151 curves

IEC 60255-151:2009 (functional requirements for over/under current protection) defines the inverse-time characteristic

t(M)=TMS kMα−1,M=IIs>1t(M) = \text{TMS}\,\frac{k}{M^{\alpha} - 1}, \qquad M = \frac{I}{I_s} > 1

with the time multiplier setting TMS (often 0.0250.025 to 1.21.2) sliding the curve up or down on a log time axis:

Curve kk α\alpha tt at M=10M = 10, TMS =1= 1 Typical use
standard inverse (SI) 0.140.14 0.020.02 2.97 s2.97\ \text{s} general, where fault current varies little with location
very inverse (VI) 13.513.5 11 1.50 s1.50\ \text{s} feeders where fault current falls along the line
extremely inverse (EI) 8080 22 0.81 s0.81\ \text{s} grading with fuses, riding through motor and transformer inrush
long-time inverse (LTI) 120120 11 13.3 s13.3\ \text{s} earth-fault backup, thermal-like protection

The same standard also includes the IEEE C37.112 (current edition 2018) moderately, very and extremely inverse curves (with an added constant term), used in North America. The steeper the curve, the better it matches a fuse, which is also an I2tI^2t device (EI is t∝1/M2t \propto 1/M^2 at high multiples).

Choosing the pickup. IsI_s must be above the largest load current with margin (typically 1.21.2 to 1.51.5 times full load, allowing for cold-load pickup), and below the smallest fault the relay must see, by a factor of about 1.51.5. The instantaneous element must not reach through a transformer or into the next zone: set it above the largest fault at the far end (often 1.31.3 times it), and above the transformer's magnetising inrush.

L1L2L3 CTs 100/1 50/51 x3 50N/51N CB1 TC trip contact, 52a, 110 V DC opens CB1

Worked example: the B1 transformer's HV relay

Given: B1's 1000 kVA1000\ \text{kVA}, 11/0.4 kV11/0.4\ \text{kV} transformer, fed through CB1 with CTs 100/1. Rated HV current In=1000 kVA/(3⋅11 kV)=52.49 AI_n = 1000\ \text{kVA}/(\sqrt{3} \cdot 11\ \text{kV}) = 52.49\ \text{A}. A three-phase fault on the 400 V400\ \text{V} busbar draws 23.68 kA23.68\ \text{kA} (Protection Principles), which is 23 680⋅0.4/11=861 A23\,680 \cdot 0.4/11 = 861\ \text{A} on the 11 kV11\ \text{kV} side. A fault at the HV terminals draws 250 MVA/(3⋅11 kV)=13.12 kA250\ \text{MVA}/(\sqrt{3} \cdot 11\ \text{kV}) = 13.12\ \text{kA}.

Find: a pickup, the operating time on the SI curve with TMS =0.2= 0.2 for the LV busbar fault, and an instantaneous setting.

Solve:

Is=70 A (0.70 A secondary)>1.2⋅52.49=63.0 AM=861 A70 A=12.30,t=0.2⋅0.1412.300.02−1=0.544 sI50≥1.3⋅861 A=1119 A ⇒ set 1200 A (12 A secondary)\begin{aligned} I_s &= 70\ \text{A} \ (0.70\ \text{A secondary}) > 1.2 \cdot 52.49 = 63.0\ \text{A} \\ M &= \frac{861\ \text{A}}{70\ \text{A}} = 12.30, \qquad t = 0.2 \cdot \frac{0.14}{12.30^{0.02} - 1} = 0.544\ \text{s} \\ I_{50} &\ge 1.3 \cdot 861\ \text{A} = 1119\ \text{A} \ \Rightarrow\ \text{set } 1200\ \text{A}\ (12\ \text{A secondary}) \end{aligned}

Check: the instantaneous element does not see a fault on the LV side (861<1200 A861 < 1200\ \text{A}), so it never races the LV breakers, but trips at once for an HV terminal fault (13.1 kA13.1\ \text{kA} is 1111 times its setting). Its setting is also about 2323 times rated current; the magnetising inrush of a transformer this size is typically 88 to 1212 times rated and rich in second harmonic, so the margin covers it (numerical relays can also block on the second harmonic). The 0.544 s0.544\ \text{s} time delay leaves room for the LV incomer to clear first, which the next lesson checks.

In Python: the four curves and the operating point

python · try it yourself
import numpy as np
import matplotlib.pyplot as plt

CURVES = {"SI": (0.14, 0.02), "VI": (13.5, 1.0), "EI": (80.0, 2.0), "LTI": (120.0, 1.0)}

def t_iec(I, Is, tms, curve):
    k, a = CURVES[curve]
    M = np.asarray(I, dtype=float) / Is
    return np.where(M > 1, tms * k / (M**a - 1), np.inf)

Is, tms, If = 70.0, 0.2, 861.2
print("curve  t(M=2)  t(M=5)  t(M=10)  t at the LV fault (TMS 0.2)")
for name in CURVES:
    t1 = [float(t_iec(m * Is, Is, 1.0, name)) for m in (2, 5, 10)]
    print(f"{name:4s} {t1[0]:7.2f} {t1[1]:7.2f} {t1[2]:8.2f}   {float(t_iec(If, Is, tms, name)):.3f} s")

I = np.logspace(np.log10(75), np.log10(2e4), 300)
fig, ax = plt.subplots(figsize=(6, 4))
for name in CURVES:
    ax.loglog(I, t_iec(I, Is, tms, name), label=name)
ax.axvline(If, ls="--", c="grey"); ax.text(If * 1.05, 20, "LV bus fault\n(861 A)", fontsize=8)
ax.axvline(1200, ls=":", c="k"); ax.text(1250, 0.03, "50 at 1200 A", fontsize=8)
ax.set_xlabel("current at 11 kV (A)"); ax.set_ylabel("operating time (s)")
ax.set_ylim(0.01, 100); ax.grid(True, which="both", alpha=0.3); ax.legend()
ax.set_title("IEC 60255-151 curves, Is = 70 A, TMS = 0.2"); fig.tight_layout()
plt.show()
curve  t(M=2)  t(M=5)  t(M=10)  t at the LV fault (TMS 0.2)
SI     10.03    4.28     2.97   0.544 s
VI     13.50    3.38     1.50   0.239 s
EI     26.67    3.33     0.81   0.106 s
LTI   120.00   30.00    13.33   2.123 s

Notice how flat SI is: from M=5M = 5 to M=10M = 10 the time only falls from 4.28 s4.28\ \text{s} to 2.97 s2.97\ \text{s}. EI drops by a factor of four over the same range, which makes it the curve of choice for grading above fuses.

Guided lab: a time–current point of a small fuse

Hand calculation. Look up the time–current curve of a 100 mA100\ \text{mA} fast-acting 5×20 mm5 \times 20\ \text{mm} glass fuse (IEC 60127-2 style). Read the pre-arcing time at 22, 33 and 55 times rated current. Compute the series resistance needed from a 12 V12\ \text{V} supply for each current (for 300 mA300\ \text{mA}: 12/0.3=40 Ω12/0.3 = 40\ \Omega, dissipating 3.6 W3.6\ \text{W}, so use a 10 W10\ \text{W} resistor).

Simulation. Fit an EI-shaped curve t=k/(M2−1)t = k/(M^2 - 1) to the datasheet points with the Python cell (change CURVES), and see how far a fuse departs from a pure I2tI^2t law at low multiples.

What you would measure. With the bench supply in constant-voltage mode at 12 V12\ \text{V} and its current limit set to 1 A1\ \text{A}, close a switch and time the blow with a scope across the fuse (the voltage jumps to 12 V12\ \text{V} when it opens). Expect times within a factor of about two of the datasheet (curves are typically given with a ±20\pm 20 to 50 %50\ \% band, and ambient temperature and holder resistance shift them). Repeat each point three times with new fuses.

Hazards and safe setup. 12 V12\ \text{V}, current-limited, on a non-flammable surface; the series resistor gets hot; glass fuses can shatter at high multiples, so wear safety glasses and stay below 1010 times rating.

Pitfalls

  • Pickup below load. A setting under the peak load or cold-load current trips healthy circuits.
  • Instantaneous reaching through. An instantaneous element set below the far-end fault current loses selectivity with the next zone.
  • Mixing curve families. IEC and IEEE "very inverse" curves are different equations; grade with the curve actually set.
  • Forgetting the CT ratio. Settings are entered in secondary amps or multiples of the CT rating: 70 A70\ \text{A} primary on a 100/1 CT is 0.70 A0.70\ \text{A}.

Practice

  1. An SI relay has Is=400 AI_s = 400\ \text{A}, TMS =0.3= 0.3. Find its operating time for 4000 A4000\ \text{A}.
  2. The same current on a VI curve with TMS =0.3= 0.3?
  3. Load is 300 A300\ \text{A} and the smallest end-of-line fault is 1500 A1500\ \text{A}. Is Is=400 AI_s = 400\ \text{A} acceptable?
Answer
  1. M=10M = 10: t=0.3⋅2.971=0.891 st = 0.3 \cdot 2.971 = 0.891\ \text{s}.
  2. t=0.3⋅13.5/9=0.450 st = 0.3 \cdot 13.5/9 = 0.450\ \text{s}.
  3. 400/300=1.33400/300 = 1.33 above load, and 1500/400=3.751500/400 = 3.75 below the minimum fault (more than 1.51.5): acceptable.

Test yourself

What does the time multiplier setting (TMS) change?

  1. the pickup current
  2. the shape of the curve
  3. the operating time by a constant factor at every current
  4. the CT ratio

On the IEC standard inverse curve with TMS = 1, what is the operating time at M = 10?

  1. 0.81 s
  2. 1.50 s
  3. 2.97 s
  4. 13.3 s

Why is the extremely inverse curve preferred when grading a relay above fuses?

  1. it is fastest at low currents
  2. its t∝1/M2t \propto 1/M^2 shape follows a fuse's I2tI^2t characteristic
  3. it ignores the DC offset
  4. it needs no CT

An earth-fault element (51N) can be set well below load current because…

  1. earth faults are always larger than load
  2. it measures the residual current, which is nearly zero for balanced healthy loads
  3. it uses a VT
  4. the CTs saturate on load