Mini Project: A Power-System Study of a Small Industrial Site

A factory is moving into the site of board B1, the running example of the protection lessons: an 11 kV11\ \text{kV} supply, a 1000 kVA1000\ \text{kVA} transformer and a 400 V400\ \text{V} main switchboard with a workshop sub-board at the end of a 100 m100\ \text{m} cable. Before anything is ordered, the client wants a power-system study: will the transformer carry the load, are the voltages acceptable, how large should the power-factor correction be, can the switchgear break the fault current, and do the relays discriminate? This project walks the whole chain, step by step, with the methods of the course: load list → one-line diagram → per-unit model → load flow and voltage drop → power-factor correction → short-circuit levels and breaker duty → protection grading → write-up.

Safety: calculation and simulation only. Every item in this study is 11 kV11\ \text{kV} or 400 V400\ \text{V} three-phase plant. Surveys, measurements, switching, relay testing and commissioning on a real site are work for qualified and authorised people with rated instruments. The optional bench lab at the end is a 12 V12\ \text{V} DC analogue.

The brief and the data

Item Value Source
supply 11 kV11\ \text{kV}, three-phase fault level 250 MVA250\ \text{MVA}, X/R=10X/R = 10 network operator's letter (assumed)
transformer T1 1000 kVA1000\ \text{kVA}, 11/0.4 kV11/0.4\ \text{kV} Dyn11, z=6 %z = 6\ \%, X/R=6X/R = 6, off-load taps ±2×2.5 %\pm 2 \times 2.5\ \% Protection Principles
main board MSB 400 V400\ \text{V}, TN-C-S (Earthing Systems)
sub-board DB1 100 m100\ \text{m} of 4×95 mm24 \times 95\ \text{mm}^2 Cu XLPE, 0.193+j0.080 Ω/km0.193 + j0.080\ \Omega/\text{km} at 20 ∘C20\,^\circ\text{C} Coordination and Grading
relays R1 (HV, CT 100/1), R2 (LV incomer, CT 1600/1), R3 (DB1 feeder, CT 400/1), IEC standard inverse same
client's rules transformer ≤80 %\le 80\ \% at maximum demand; pf ≥0.95\ge 0.95 (tariff); motor-start dip ≤3 %\le 3\ \% at the MSB assumed

The voltage-drop limits are those of IEC 60364-5-52 Annex G (informative; edition 2009 with Amendment 1 of 2024, as of November 2026) for an installation fed from its own transformer: 6 %6\ \% for lighting and 8 %8\ \% for other uses, from the origin of the installation to the equipment, under normal operation. Check the edition and the national version in force; many national rules and client specifications are stricter.

Step 1: the load list

A study begins with a table of every load: rating, efficiency, power factor, and a demand factor (the fraction of the rating that is drawn at the time of maximum demand). Motor ratings are shaft outputs, so their input is rating/efficiency; drives, HVAC and lighting are listed by input. The values are typical design figures for this kind of plant, to be replaced by the client's real data.

ID Load Rating η\eta pf Demand factor Board
M1 air compressor 110 kW110\ \text{kW} motor 0.9550.955 0.870.87 0.90.9 MSB
M2, M3 process pumps 2×45 kW2 \times 45\ \text{kW} motors 0.940.94 0.860.86 0.80.8 MSB
D1 production-line drives (VFDs) 250 kW250\ \text{kW} input n/a 0.950.95 0.80.8 MSB
H1 chiller and HVAC 132 kW132\ \text{kW} input n/a 0.850.85 0.80.8 MSB
L1 lighting and small power 90 kW90\ \text{kW} n/a 0.950.95 0.70.7 MSB
DB1 workshop sub-board (welders, small motors) 200 kW200\ \text{kW} connected n/a 0.800.80 0.60.6 DB1

The program sums complex powers (Complex Power Flow) and, looking ahead to step 5, sizes the capacitor bank.

python · try it yourself
import numpy as np

# Step 1: load list (400 V). Input power = rating / efficiency (motors) or the input rating, times demand factor
loads = [  # id, description, board, rated kW, efficiency (1 = input rating), pf, demand factor
    ("M1", "air compressor", "MSB", 110, 0.955, 0.87, 0.9),
    ("M2", "process pump", "MSB", 45, 0.940, 0.86, 0.8),
    ("M3", "process pump", "MSB", 45, 0.940, 0.86, 0.8),
    ("D1", "production-line drives", "MSB", 250, 1.0, 0.95, 0.8),
    ("H1", "chiller and HVAC", "MSB", 132, 1.0, 0.85, 0.8),
    ("L1", "lighting and small power", "MSB", 90, 1.0, 0.95, 0.7),
    ("DB1", "workshop sub-board", "DB1", 200, 1.0, 0.80, 0.6),
]
P = {"MSB": 0.0, "DB1": 0.0}; Q = {"MSB": 0.0, "DB1": 0.0}
print(f"{'id':4s}{'description':29s}{'P kW':>7s}{'Q kvar':>8s}{'S kVA':>7s}")
for id_, desc, board, kw, eff, pf, df in loads:
    p = kw / eff * df
    q = p * np.tan(np.arccos(pf))
    P[board] += p; Q[board] += q
    print(f"{id_:4s}{desc:29s}{p:7.1f}{q:8.1f}{np.hypot(p, q):7.1f}")
Pt, Qt = sum(P.values()), sum(Q.values())
St = np.hypot(Pt, Qt)
print(f"main-board loads {P['MSB']:.1f} kW + j{Q['MSB']:.1f} kvar, DB1 {P['DB1']:.1f} kW + j{Q['DB1']:.1f} kvar")
print(f"site maximum demand: {Pt:.1f} kW, {Qt:.1f} kvar, {St:.1f} kVA, pf {Pt/St:.3f}")
print(f"transformer loading {St/1000*100:.1f} % of 1000 kVA, LV current {St*1e3/(np.sqrt(3)*400):.0f} A, "
      f"DB1 feeder {np.hypot(P['DB1'], Q['DB1'])*1e3/(np.sqrt(3)*400):.0f} A")

# Step 5: power-factor correction to 0.95 at the main board, and the resonance check
Qc_need = Pt * (Qt / Pt - np.tan(np.arccos(0.95)))
Qc = 150.0                                         # chosen: 6 steps of 25 kvar
S_new = np.hypot(Pt, Qt - Qc)
print(f"kvar for pf 0.95: {Qc_need:.1f}; chosen {Qc:.0f} kvar -> pf {Pt/S_new:.3f}, {S_new:.1f} kVA, "
      f"{S_new*1e3/(np.sqrt(3)*400):.0f} A")
Ssc = 15.63e3                                      # fault level at the main board, kVA (Power Quality lesson)
print("undetuned resonance h = sqrt(Ssc/Qc) for 25..150 kvar:",
      ", ".join(f"{np.sqrt(Ssc/q):.1f}" for q in range(25, 175, 25)))
print(f"7 % detuning reactor: tuning at h = {1/np.sqrt(0.07):.2f}, capacitor voltage {400/(1-0.07):.0f} V")
id  description                     P kW  Q kvar  S kVA
M1  air compressor                 103.7    58.7  119.2
M2  process pump                    38.3    22.7   44.5
M3  process pump                    38.3    22.7   44.5
D1  production-line drives         200.0    65.7  210.5
H1  chiller and HVAC               105.6    65.4  124.2
L1  lighting and small power        63.0    20.7   66.3
DB1 workshop sub-board             120.0    90.0  150.0
main-board loads 548.9 kW + j256.1 kvar, DB1 120.0 kW + j90.0 kvar
site maximum demand: 668.9 kW, 346.1 kvar, 753.1 kVA, pf 0.888
transformer loading 75.3 % of 1000 kVA, LV current 1087 A, DB1 feeder 217 A
kvar for pf 0.95: 126.2; chosen 150 kvar -> pf 0.960, 697.0 kVA, 1006 A
undetuned resonance h = sqrt(Ssc/Qc) for 25..150 kvar: 25.0, 17.7, 14.4, 12.5, 11.2, 10.2
7 % detuning reactor: tuning at h = 3.78, capacitor voltage 430 V

Maximum demand is 669 kW669\ \text{kW} and 753 kVA753\ \text{kVA} at pf 0.8880.888: the transformer is at 75 %75\ \%, inside the client's 80 %80\ \% rule, with room for some growth (more after correction). The workshop feeder carries 217 A217\ \text{A}.

Step 2: the one-line diagram and the per-unit model

~11 kV, 250 MVA CB1 + R1 (CT 100/1) T1 1000 kVA, 11/0.4 kVDyn11, z = 6 % CB2 + R2 (CT 1600/1) MSB 400 V F1 MM1 110 kWstar-delta MM2, M32 x 45 kW ~/~D1 250 kWVFDs H1 132 kWHVAC L1 90 kWlighting 150 kvardetuned CB3, R3CT 400/1 100 m95 mm2 Cu DB1120 kW, pf 0.8 F2

The one-line diagram (Structure and Components) is the study's single source of truth: every impedance, rating and relay is on it. With Sb=1 MVAS_b = 1\ \text{MVA} and Vb=11 kVV_b = 11\ \text{kV} / 0.4 kV0.4\ \text{kV} (The Per-Unit System), Zb=0.16 ΩZ_b = 0.16\ \Omega on the 400 V400\ \text{V} side, the transformer's 6 %6\ \% is 0.06 pu0.06\ \text{pu} directly (its rating equals the base), the grid is Sb/Sk=0.004 puS_b/S_k = 0.004\ \text{pu}, and the cable at its operating temperature of 90 ∘C90\,^\circ\text{C} (R=0.193⋅1.275=0.246 Ω/kmR = 0.193 \cdot 1.275 = 0.246\ \Omega/\text{km}) is (0.0246+j0.0080)/0.16=0.154+j0.050 pu(0.0246 + j0.0080)/0.16 = 0.154 + j0.050\ \text{pu}. Note the size of that last number: 100 m100\ \text{m} of LV cable has more resistance than the whole 1000 kVA1000\ \text{kVA} transformer. Use the hot resistance for voltage drop and losses and the 20 ∘C20\,^\circ\text{C} value for maximum fault currents, as IEC 60909 does.

Step 3: load flow and voltage drop

The site is radial, so a backward/forward sweep with constant-power loads converges in a few iterations (Distribution Systems); a general network would need Newton–Raphson. The 11 kV11\ \text{kV} supply is taken at 1.00 pu1.00\ \text{pu}, the network operator's declared value. The transformer's off-load tap is the one free variable: tapping −2.5 %-2.5\ \% on the HV winding raises the no-load LV voltage by about 2.5 %2.5\ \%.

Step 4: motor starting

The 110 kW110\ \text{kW} compressor is the largest motor. Direct on line it draws about 77 times its rated current at pf 0.30.3; a star–delta starter cuts that to a third (Starting Methods). The extra dip at the MSB is about ∣zs+zT1∣ Istart\lvert z_s + z_{T1} \rvert\,I_\text{start} in per unit, because the starting current is nearly in phase with the source impedance.

python · try it yourself
import numpy as np

# Step 2: per-unit model on S_b = 1 MVA, V_b = 11 kV / 0.4 kV (Z_b = 121 / 0.16 Ohm)
Zb = 0.4**2 / 1.0
zs = 1 / 250 * (1 + 10j) / np.sqrt(101)            # grid: 250 MVA at 11 kV, X/R = 10
zt = 0.06 * (1 + 6j) / np.sqrt(37)                 # T1: 1000 kVA (= system base), z = 6 %, X/R = 6
zc = 0.1 * (0.246 + 0.080j) / Zb                   # 100 m of 95 mm2 Cu at 90 C (0.193 Ohm/km at 20 C x 1.275)
print(f"z_grid = {zs.real:.5f} + j{zs.imag:.5f}, z_T1 = {zt.real:.5f} + j{zt.imag:.5f}, "
      f"z_cable = {zc.real:.4f} + j{zc.imag:.4f} pu")

# Step 3: load flow of the radial site with constant-power loads (backward/forward sweep)
S_msb, S_db1 = 0.5489 + 0.2561j, 0.1200 + 0.0900j  # MVA = pu, from step 1
def solve(tap, Qc=0.0, scale=1.0):
    """tap: boost of the LV no-load voltage by the off-load tap (pu); Qc: bank in Mvar at 1 pu."""
    E = 1.0 + tap
    v_msb = v_db1 = complex(E)
    for _ in range(50):
        i_db1 = np.conj(scale * S_db1 / v_db1)
        i_msb = np.conj((scale * S_msb - 1j * Qc * abs(v_msb)**2) / v_msb) + i_db1
        v_msb = E - (zs + zt) * i_msb
        v_db1 = v_msb - zc * i_db1
    loss = abs(i_msb)**2 * (zs + zt).real + abs(i_db1)**2 * zc.real
    return abs(v_msb), abs(v_db1), 1e3 * loss
for tap, Qc, scale, label in ((0.0, 0.0, 1, "principal tap, no bank"), (0.0, 0.15, 1, "principal tap, 150 kvar"),
                              (0.025, 0.15, 1, "tap +2.5 %, 150 kvar"), (0.025, 0.0, 0.25, "tap +2.5 %, 25 % load")):
    vm, vd, loss = solve(tap, Qc, scale)
    print(f"{label:23s}: MSB {vm:.4f} pu ({400*vm:.1f} V), DB1 {vd:.4f} pu ({400*vd:.1f} V), "
          f"cable drop {100*(vm-vd)/vm:.2f} %, losses {loss:.1f} kW")

# Step 4: starting M1 (110 kW, locked-rotor current 7 I_n at pf 0.30)
In = 110e3 / (np.sqrt(3) * 400 * 0.955 * 0.87)
for method, k in (("direct on line", 1.0), ("star-delta", 1 / 3)):
    Ist = 7 * In * k
    s_st = np.sqrt(3) * 400 * Ist * (0.30 + 1j * np.sqrt(1 - 0.30**2)) / 1e6
    print(f"M1 {method:14s}: I_n {In:.0f} A, starting current {Ist:5.0f} A, extra dip at the MSB "
          f"{100*abs((zs + zt) * s_st):.2f} %")
z_grid = 0.00040 + j0.00398, z_T1 = 0.00986 + j0.05918, z_cable = 0.1537 + j0.0500 pu
principal tap, no bank : MSB 0.9694 pu (387.8 V), DB1 0.9451 pu (378.0 V), cable drop 2.51 %, losses 10.1 kW
principal tap, 150 kvar: MSB 0.9790 pu (391.6 V), DB1 0.9549 pu (382.0 V), cable drop 2.46 %, losses 9.1 kW
tap +2.5 %, 150 kvar   : MSB 1.0050 pu (402.0 V), DB1 0.9816 pu (392.7 V), cable drop 2.33 %, losses 8.6 kW
tap +2.5 %, 25 % load  : MSB 1.0179 pu (407.2 V), DB1 1.0122 pu (404.9 V), cable drop 0.56 %, losses 0.6 kW
M1 direct on line: I_n 191 A, starting current  1338 A, extra dip at the MSB 5.93 %
M1 star-delta    : I_n 191 A, starting current   446 A, extra dip at the MSB 1.98 %

Results. At the principal tap and without correction, DB1 sits 5.5 %5.5\ \% below 400 V400\ \text{V} before any final circuit: legal (the 8 %8\ \% budget leaves 2.5 %2.5\ \% for the final circuits) but tight, and lighting on DB1 would already be close to its 6 %6\ \%. The capacitor bank lifts both boards by about 1 %1\ \% (QCX/V2Q_C X/V^2, Reactive Power and Voltage) and the +2.5 %+2.5\ \% tap by 2.5 %2.5\ \% more, giving 402 V402\ \text{V} at the MSB and 1.8 %1.8\ \% below nominal at DB1. At light load (25 %, bank switched out by its controller) the MSB rises to 407 V407\ \text{V}, +1.8 %+1.8\ \%, well inside the +10 %+10\ \% band. Recommendation: tap +2.5 %+2.5\ \%. Losses in transformer windings, grid and cable are about 9 kW9\ \text{kW} at maximum demand, to which the transformer's no-load loss must be added.

Direct-on-line starting of M1 would dip the board by 5.9 %5.9\ \%, twice the client's 3 %3\ \% rule; star–delta gives 2.0 %2.0\ \%. Recommendation: star–delta (or a soft starter) for M1; the pumps (6.56.5 times 80 A80\ \text{A}, about 2.3 %2.3\ \% each by the same formula) may start direct on line, one at a time. Step 7 finds a second reason.

Step 5: power-factor correction

From step 1: 126 kvar126\ \text{kvar} brings the site to pf 0.950.95. Choose a 150 kvar150\ \text{kvar} automatic bank in six 25 kvar25\ \text{kvar} steps, controlled to hold about 0.960.96 and never to over-compensate at light load. The resonance check (Power Quality) decides the type: with the MSB fault level of 15.6 MVA15.6\ \text{MVA}, the parallel resonance h=Ssc/QCh = \sqrt{S_{sc}/Q_C} moves from 2525 down to 10.210.2 as steps switch in, straight through the 1313th and 1111th harmonics of the drives D1 (6-pulse drives produce 55th, 77th, 1111th, 1313th…). A plain bank would amplify them. A detuned bank with 7 %7\ \% reactors (tuned to h=3.78h = 3.78, below the 55th) makes the bank inductive for every harmonic present; its capacitors see 430 V430\ \text{V} at 400 V400\ \text{V} and must be rated for it (440440 or 480 V480\ \text{V} units). The bank is rated by its effective output at 400 V400\ \text{V} with the reactor.

The correction also lowers the incomer current from 10871087 to 1006 A1006\ \text{A} and the site's I2RI^2R losses by about 10 %10\ \% (step 3: 10.1→9.1 kW10.1 \to 9.1\ \text{kW}).

The lab is one phase of the site at the principal tap, with the loads as their equivalent impedance at 400 V400\ \text{V} (R=0.2392 ΩR = 0.2392\ \Omega in parallel with L=1.4715 mHL = 1.4715\ \text{mH}) behind the grid-and-transformer impedance (1.642 mΩ1.642\ \text{m}\Omega, 32.17 μH32.17\ \mu\text{H}). With C1 at its minimum (bank off) the MSB shows 224.3 V224.3\ \text{V} (388.6 V388.6\ \text{V} line to line) and the supply current I(RS)=1056 AI(\text{RS}) = 1056\ \text{A} at −29.5∘-29.5^\circ (I(V1) shows the same current with SPICE's sign, at 150.5∘150.5^\circ); with C1 at 2.984 mF2.984\ \text{mF} (the 150 kvar150\ \text{kvar} bank, per phase of the star equivalent) the voltage rises to 226.4 V226.4\ \text{V} and the current falls to 986 A986\ \text{A} at −18.6∘-18.6^\circ. The small differences from the load flow come from the impedance-load model and from leaving out the cable.

0100200100m1101001k10kf (Hz)|V| (V)0 A50 kA100 kA|I| (A)|V(msb)||I(RS)|phasors at f = 50.00 Hz (magnitude @ phase)V(s)231 V @ 0.0 degV(a)229 V @ 0.2 degV(msb)224 V @ -2.2 degI(V1)1.06 kA @ 150.5 degI(RS)1.06 kA @ -29.5 degI(LS)1.06 kA @ -29.5 degI(RL)938 A @ -2.2 degI(LL)485 A @ -92.2 degI(C1)70.5 mA @ 87.8 deg

Step 6: short-circuit levels and breaker duty

Following IEC 60909 with c=1.05c = 1.05 (Fault Levels and Breaker Duty): the grid and transformer alone give 23.68 kA23.68\ \text{kA} at the MSB (F1) and 8.76 kA8.76\ \text{kA} at DB1 (F2), the values used throughout the protection lessons. Here the standard asks for more: induction motors feed a fault for a few cycles, and low-voltage motors may be left out only if they contribute no more than 5 %5\ \% of the initial short-circuit current calculated without them (IEC 60909-0:2016; the 2001 edition used the sum of their rated currents against 1 %1\ \% of that current). Edition 3.0 of IEC 60909-0 was published on 23 July 2026; the factors used here are those of the 2016 edition, so check them against the new text before a real study. Each motor is a source behind ZM=U2/(kLRSrM)Z_M = U^2/(k_{LR} S_{rM}) with RM/XM=0.42R_M/X_M = 0.42 (LV motors); drives without regenerative front ends are left out. The cable's adiabatic withstand (IEC 60364-4-43, I2t≤k2S2I^2t \le k^2S^2 with k=143k = 143 for copper with XLPE) is checked against the clearing time of R3 (Coordination and Grading).

Step 7: protection grading

The relay settings of the Coordination lesson (R3 250 A250\ \text{A}, TMS 0.10.1; R2 1600 A1600\ \text{A}, TMS 0.150.15; R1 70 A70\ \text{A}, TMS 0.300.30, instantaneous 1200 A1200\ \text{A}) are re-checked for this site, plus two operating cases that a fault study alone misses: the compressor start through the incomer, and the transformer's inrush current at energisation (taken as 1212 times rated for 0.1 s0.1\ \text{s}: the conventional "inrush point" of grading practice, usually 88 to 1212 times for distribution transformers; a rule of thumb, not a value from a standard).

python · try it yourself
import numpy as np

U, c = 400.0, 1.05
Zq = complex(1.642e-3, 10.106e-3)                  # grid + T1 at 400 V (Protection Principles)
Zcab = 0.1 * complex(0.193, 0.080)                 # 100 m of 95 mm2 Cu at 20 C: maximum fault current
kappa = lambda xr: 1.02 + 0.98 * np.exp(-3 / xr)   # IEC 60909 peak factor

# Step 6: short-circuit levels, IEC 60909, with the motors' contribution (R_M/X_M = 0.42, LV motors)
motors = [(110, 0.955, 0.87, 7.0), (45, 0.94, 0.86, 6.5), (45, 0.94, 0.86, 6.5)]   # kW, eff, pf, I_LR/I_rM
Ir_sum = sum(kw * 1e3 / (np.sqrt(3) * U * e * pf) for kw, e, pf, _ in motors)
YM = sum(lr * kw * 1e3 / (e * pf) / U**2 / ((0.42 + 1j) / np.hypot(0.42, 1)) for kw, e, pf, lr in motors)
ZM = 1 / YM
IkM = c * U / np.sqrt(3) / abs(ZM)                  # motors alone, at the MSB
print(f"motor rated currents {Ir_sum:.0f} A; motor contribution {IkM/1e3:.2f} kA > 5 % of I_k without motors "
      f"= {0.05 * c * U / np.sqrt(3) / abs(Zq) / 1e3:.2f} kA: include them")
for name, Zf, Icu, Icm in (("MSB", 0, 50, 105), ("DB1", Zcab, 25, 52.5)):
    Zg = Zq + Zf
    Iq = c * U / np.sqrt(3) / abs(Zg)                       # from the grid
    Ik = c * U / np.sqrt(3) / abs(Zq * ZM / (Zq + ZM) + Zf)  # grid and motors
    ip = kappa(Zg.imag / Zg.real) * np.sqrt(2) * Iq + 1.3 * np.sqrt(2) * (Ik - Iq)
    print(f"{name}: I_k grid {Iq/1e3:5.2f} kA, with motors {Ik/1e3:5.2f} kA, i_p {ip/1e3:5.1f} kA; "
          f"breaker {Icu} kA / {Icm} kA peak -> {'OK' if Icu*1e3 >= Ik and Icm*1e3 >= ip else 'TOO SMALL'}")

# cable withstand, adiabatic (IEC 60364-4-43): I^2 t <= k^2 S^2, k = 143 for Cu/XLPE
k, S = 143, 95
for I, t, where in ((23.68e3, 0.147 + 0.05, "MSB end"), (8.76e3, 0.190 + 0.05, "DB1 end")):
    print(f"cable fault at {where}: R3 + breaker {t:.3f} s, allowed {(k*S/I)**2:.2f} s")

# Step 7: protection checks with the settings of the Coordination lesson (IEC standard inverse)
si = lambda I, Is, tms: tms * 0.14 / ((I / Is)**0.02 - 1) if I > Is else np.inf
print(f"margins: R2-R3 at F2 {si(8760, 1600, 0.15) - si(8760, 250, 0.1):.3f} s, "
      f"R1-R2 at F1 {si(861, 70, 0.30) - si(23680, 1600, 0.15):.3f} s")
In1 = 110e3 / (np.sqrt(3) * U * 0.955 * 0.87)
I_run = 1087 * np.exp(-1j * np.arccos(0.888))       # site maximum demand before correction
for method, k_st in (("DOL", 1.0), ("star-delta", 1 / 3)):
    I = abs(I_run - In1 * np.exp(-1j * np.arccos(0.87)) + 7 * In1 * k_st * np.exp(-1j * np.arccos(0.30)))
    t = si(I, 1600, 0.15)
    print(f"incomer during an M1 {method:10s} start: {I:5.0f} A -> R2 " + (f"trips in {t:.1f} s" if t < np.inf else "does not pick up"))
In_hv = 1000e3 / (np.sqrt(3) * 11e3)
print(f"T1 inrush about 12 x {In_hv:.2f} A = {12*In_hv:.0f} A for 0.1 s: below R1's 1200 A instantaneous; "
      f"its IDMT element would need {si(12*In_hv, 70, 0.30):.2f} s")
motor rated currents 352 A; motor contribution 2.50 kA > 5 % of I_k without motors = 1.18 kA: include them
MSB: I_k grid 23.68 kA, with motors 26.12 kA, i_p  58.8 kA; breaker 50 kA / 105 kA peak -> OK
DB1: I_k grid  8.76 kA, with motors  8.95 kA, i_p  13.4 kA; breaker 25 kA / 52.5 kA peak -> OK
cable fault at MSB end: R3 + breaker 0.197 s, allowed 0.33 s
cable fault at DB1 end: R3 + breaker 0.240 s, allowed 2.40 s
margins: R2-R3 at F2 0.417 s, R1-R2 at F1 0.437 s
incomer during an M1 DOL        start:  2066 A -> R2 trips in 4.1 s
incomer during an M1 star-delta start:  1249 A -> R2 does not pick up
T1 inrush about 12 x 52.49 A = 630 A for 0.1 s: below R1's 1200 A instantaneous; its IDMT element would need 0.94 s

Breaker duty. The motors raise the MSB's initial symmetrical current from 23.723.7 to 26.1 kA26.1\ \text{kA} and the peak to about 59 kA59\ \text{kA} (the motor share with κM=1.3\kappa_M = 1.3). The 50 kA50\ \text{kA} incomer and bus-section breakers (making capacity 105 kA105\ \text{kA} peak, the factor n=2.1n = 2.1 for 20<Icu≤50 kA20 < I_{cu} \le 50\ \text{kA} in IEC 60947-2 Table 2; current edition 2024) have a wide margin; a 25 kA25\ \text{kA} MCCB board is enough at DB1. The motor contribution dies away within a few cycles, so the time-graded relays, which act after 0.2 s0.2\ \text{s} or more, see only the grid's 23.68 kA23.68\ \text{kA}: the grading below stays valid.

Cable. At the sending end of the cable a fault draws the full MSB current; R3 and its breaker clear it in 0.20 s0.20\ \text{s}, inside the 0.33 s0.33\ \text{s} the 95 mm295\ \text{mm}^2 conductor can withstand. Without R3's fast clearance (say, if it were set slower to grade with something downstream) the cable would need a larger section or an instantaneous element.

Overload of the cable. A 95 mm295\ \text{mm}^2 copper XLPE cable carries about 280280 to 300 A300\ \text{A} continuously when clipped direct or on a tray in free air, and less in conduit, buried or grouped (IEC 60364-5-52 Annex B tables; typical values, from memory), and IEC 60364-4-43 needs IB≤In≤IzI_B \le I_n \le I_z for overload protection. R3's pickup of 250 A250\ \text{A} was chosen for exactly this: above the feeder's IB=217 AI_B = 217\ \text{A} and not above IzI_z, so the one relay gives overload, short-circuit and backup protection. A pickup chosen for fault grading alone (for example 480 A480\ \text{A}, which grades just as well) would let the cable run at almost twice its rating without a trip. Action: confirm Iz≥250 AI_z \ge 250\ \text{A} for the actual installation method and grouping; if it is lower, choose a larger cable rather than a pickup below the design current.

Grading and operating cases. The margins of 0.42 s0.42\ \text{s} (R2 over R3) and 0.44 s0.44\ \text{s} (R1 over R2) exceed the 0.3 s0.3\ \text{s} target. A direct-on-line start of M1 would push the incomer to 2066 A2066\ \text{A}, above R2's 1600 A1600\ \text{A} pickup, and R2 would trip after 4.1 s4.1\ \text{s}: about the run-up time of a loaded screw compressor, so the main breaker could trip the whole site on a start. With star–delta the incomer stays at 1249 A1249\ \text{A}. Transformer inrush does not reach R1's instantaneous element. Earth faults and the disconnection times of final circuits are covered by the method of Earthing Systems, and arc-flash labelling by Surges, Insulation and Arc Flash; both belong in a full study.

Cross-check in SPICE: the peak factor

The IEC 60909 peak factor κ=1.02+0.98 e−3R/X\kappa = 1.02 + 0.98\,e^{-3R/X} is an empirical fit. A transient simulation of one phase of the MSB fault loop (1.642 mΩ1.642\ \text{m}\Omega and 32.17 μH32.17\ \mu\text{H} behind c U/3=242.5 Vc\,U/\sqrt{3} = 242.5\ \text{V} rms), closing at a voltage zero, gives the exact first peak (Symmetrical Faults).

bash · try it yourself
cat > msb.cir <<'EOF'
* MSB fault loop, one phase: c U/sqrt3 = 242.49 V rms behind 1.642 mOhm + 32.17 uH; fault at a voltage zero
V1 a 0 SIN(0 342.93 50 0 0 0)
R1 a b 1.642m
L1 b 0 32.168u
.control
tran 2u 120m uic
let ik = -i(V1)
meas tran ipeak MAX ik FROM=0 TO=20m
meas tran isteady MAX ik FROM=100m TO=120m
let kappa = ipeak / (1.41421 * 23680)
print kappa
.endc
.end
EOF
ngspice -b msb.cir 2>&1 | grep -E '^(ipeak|isteady|kappa)'
ipeak               =  5.403114e+04 at=  9.166580e-03
isteady             =  3.361813e+04 at=  1.094846e-01
kappa = 1.613424e+00

The simulated first peak is 54.0 kA54.0\ \text{kA} (κ=1.613\kappa = 1.613) against 54.3 kA54.3\ \text{kA} (κ=1.622\kappa = 1.622) from the formula: the standard errs slightly on the safe side. The steady peak, 33.6 kA33.6\ \text{kA}, is 2⋅23.68 kA=33.5 kA\sqrt{2} \cdot 23.68\ \text{kA} = 33.5\ \text{kA} plus a last trace of the decaying DC offset.

Guided lab (optional): the site as a 12 V DC model

Hand calculation. Scale the site to a DC analogue: a 12.0 V12.0\ \text{V} bench supply (current limit 1 A1\ \text{A}) as the grid, a 0.5 Ω0.5\ \Omega resistor as transformer plus grid, a 47 Ω47\ \Omega resistor as the MSB load and, behind a 2.2 Ω2.2\ \Omega "cable", a 100 Ω100\ \Omega resistor as DB1. Predict both node voltages and the percentage drop on the "cable", as in step 3 (all resistors ±1 %\pm 1\ \%, rated 10 W10\ \text{W}).

Simulation. Enter the network in the netlist lab (DC) or run the sweep of step 3 with real numbers.

What you would measure. The two node voltages with a multimeter, within about ±2 %\pm 2\ \% of the prediction (resistor tolerance and lead resistance). Replace the 47 Ω47\ \Omega load by 22 Ω22\ \Omega ("growth") and watch the DB1 voltage fall: the transformer's share of the drop grows, the cable's does not. On a real site, the equivalent data come from a week-long recording with a Class A power-quality analyser (IEC 61000-4-30) at the incomer, installed by an authorised electrician.

Hazards and safe setup. 12 V12\ \text{V} and current-limited only; the supply delivers about 0.37 A0.37\ \text{A} (0.65 A0.65\ \text{A} with the 22 Ω22\ \Omega load, which then dissipates about 6 W6\ \text{W}), so use 10 W10\ \text{W} resistors and let them cool before touching.

Your write-up

A study report is short and checkable. Use these headings:

  1. Purpose and scope: what was asked, what is not covered (here: earthing and disconnection times, arc flash, harmonics in detail).
  2. Data and assumptions: the one-line diagram, the data table with sources, the load list with demand factors, standards and editions used (for example IEC 60909-0:2016 or its 2026 edition 3.0, IEC 60364-4-43:2023, IEC 60364-5-52:2009+A1:2024, IEC 60947-2:2024).
  3. Load flow and voltage: a table of board voltages for each case (tap, bank, light load), the voltage-drop budget, the recommended tap.
  4. Power-factor correction: kvar, steps, detuning and capacitor voltage rating, with the resonance check.
  5. Short circuit and equipment duty: maximum fault currents at each board with and without motors, breaker ratings against them, cable withstand.
  6. Protection: settings table, coordination plot, margins, operating cases (starting, inrush), the cable-overload check.
  7. Recommendations in a numbered list (tap +2.5 %+2.5\ \%; M1 star–delta or soft start; 150 kvar150\ \text{kvar} detuned bank; confirm the DB1 cable's Iz≥250 AI_z \ge 250\ \text{A} for R3's overload setting), each with its reason.
  8. Uncertainty: which inputs drive the answers (here the demand factors and the grid fault level, which the network operator may change; rerun with ±20 %\pm 20\ \% on each) and what should be measured after commissioning.

Extensions

  • Add a 300 kWp300\ \text{kWp} rooftop PV plant on the MSB and redo the light-load voltage at +2.5 %+2.5\ \% tap (Solar PV), and the reverse power through R2.
  • Compute the single-phase earth-fault current at DB1 and check a final circuit's disconnection time (Earthing Systems).
  • Check the harmonic voltage distortion at the MSB from D1 with and without the detuned bank (Power Quality).
  • Replace the star–delta starter by a VFD for M1 and repeat steps 4, 6 and 7.

Test yourself

Why is the 100 m cable modelled with its resistance at 90 °C in the load flow but at 20 °C in the maximum fault calculation?

  1. it is a mistake; both should use 20 °C
  2. the hot resistance gives the worst (largest) voltage drop, the cold resistance the largest fault current
  3. IEC 60909 requires 90 °C
  4. the cable cools down during a fault

The MSB fault level is 15.6 MVA. An undetuned 125 kvar capacitor bank would resonate near…

  1. the 3rd harmonic
  2. the 5th harmonic
  3. the 11th harmonic
  4. the 50th harmonic

Why may the relays still be graded with the 23.68 kA grid contribution although the motors raise the MSB fault current to 26.1 kA?

  1. motor contribution is never counted
  2. the motor contribution decays within a few cycles, before time-graded relays operate
  3. relays cannot measure motor current
  4. the motors trip first

What did step 7 find about starting the 110 kW compressor direct on line?

  1. nothing; it is fine
  2. the incomer current would exceed R2's pickup and could trip the site after about 4 s
  3. the transformer would overheat
  4. R1's instantaneous element would trip

The DB1 feeder carries 217 A at maximum demand and its 95 mm295\ \text{mm}^2 cable, clipped direct, about 280 A. Why does R3 pick up at 250 A rather than at 480 A, which would grade with R2 just as well?

  1. IEC 60364-4-43 overload protection needs IB≤In≤IzI_B \le I_n \le I_z
  2. a lower pickup is needed for the adiabatic withstand I2t≤k2S2I^2t \le k^2S^2
  3. a higher pickup would exceed the breaking capacity
  4. the grading margin to R2 would be too small at 480 A