Before calculating anything, an engineer needs to read the system: which voltage each part runs at, how substations are arranged so that one fault does not black out a city, where overhead lines are used and where cables, and what the loads look like over a day. This lesson is that map. The calculations that follow in the course all start from a one-line diagram like the ones here.

Safety: substations, switchgear, lines and cables are high-voltage plant. Clearances, earthing and switching are governed by strict rules and done by authorised people; this course treats them by description and calculation only.

Voltage levels

IEC 60038 (IEC standard voltages, edition 7.0, 2009, amendment 1 of 2021) lists preferred nominal voltages. The names "MV", "HV" and "EHV" are not defined the same way everywhere; the grouping below is a common one.

Level Typical nominal voltages (line-to-line) Role
low voltage (LV) 230/400 V230/400\ \text{V} (Europe, much of Asia), 120/240120/240, 120/208120/208, 277/480 V277/480\ \text{V} (North America) homes, offices, small industry
medium voltage (MV) 6.66.6, 1010, 1111, 2020, 2222, 3333, 35 kV35\ \text{kV} urban and rural distribution, large buildings and factories
high voltage (HV) 6666, 110110, 132132, 150 kV150\ \text{kV} subtransmission, large industry
extra-high voltage (EHV) 220220, 275275, 330330, 380380, 400400, 500 kV500\ \text{kV} national transmission grids
ultra-high voltage (UHV) 765 kV765\ \text{kV} and 1000 kV1000\ \text{kV} AC, ±800\pm 800 to ±1100 kV\pm 1100\ \text{kV} DC very long, very large transfers

Equipment is rated by the highest voltage for equipment UmU_m, which is above nominal: 12 kV12\ \text{kV} for an 11 kV11\ \text{kV} system, 145 kV145\ \text{kV} for 132 kV132\ \text{kV}, 420 kV420\ \text{kV} for 400 kV400\ \text{kV}. The low-voltage supply at the customer is allowed to vary, for example 230 V±10 %230\ \text{V} \pm 10\ \% (for 95 % of the 10-minute averages in a week) under EN 50160 (2010 edition with amendments, as of 2026) (Power Quality).

Substations and switchgear

A substation joins lines, transformers and loads at a node. Its main parts:

  • Busbars: the node itself, rigid conductors that every circuit connects to.
  • Circuit breakers interrupt load and fault currents (tens of kiloamperes) on command from protection.
  • Disconnectors (isolators) open only when no current flows, to give a visible, lockable gap for maintenance.
  • Earthing switches connect isolated equipment solidly to earth before anyone touches it.
  • Instrument transformers (CTs and VTs) feed relays and meters (Protection Principles).
  • Power transformers, often with on-load tap changers (Voltage Control), and surge arresters.

Air-insulated switchgear (AIS) spreads these out in the open air; gas-insulated switchgear (GIS) packs them into earthed metal tubes filled with an insulating gas, needing perhaps a tenth of the area, which matters in cities. SF6\text{SF}_6, the traditional gas, is a very strong greenhouse gas, so newer designs use vacuum interrupters and alternative gas mixtures.

single bus bus fault: all lost sectionalised bus section CBbus fault: half lost double bus ABfeeders move between buses squares: circuit breakers; each also has disconnectors either side (not drawn)

The busbar scheme trades cost against security: what is lost when a breaker or a busbar fails or is out for maintenance. A single bus is cheapest; a sectionalised bus halves the loss; double busbars let every circuit move to the other bus, so a busbar outage loses none of them; ring buses and "breaker-and-a-half" schemes (three breakers for two circuits) also keep every circuit in service through any single breaker outage. These schemes are used at important transmission nodes.

Overhead lines and underground cables

Property Overhead line Underground cable
insulation air, with porcelain, glass or polymer insulators solid (XLPE) or oil-paper, in a metal screen
series inductance high (conductors far apart): ≈0.3\approx 0.3 to 0.4 Ω/km0.4\ \Omega/\text{km} at 50 Hz50\ \text{Hz} low: ≈0.1\approx 0.1 to 0.2 Ω/km0.2\ \Omega/\text{km}
shunt capacitance small: ≈10 nF/km\approx 10\ \text{nF/km} large: ≈150\approx 150 to 400 nF/km400\ \text{nF/km}
cost per km lower several times higher at HV (often quoted as 5 to 10 times at transmission voltages)
faults frequent but mostly temporary (lightning, trees): reclose and carry on rare but permanent: repair takes days to weeks
visibility, land towers and corridors invisible, narrow trench; used in cities

The reactance and capacitance figures are typical orders of magnitude; Line Resistance and Inductance and Line Capacitance and Cables compute them from geometry.

Loads over a day

A network is sized for its peak demand but earns money on its energy. Three ratios describe loads:

load factor=PavgPpeak,diversity factor=∑kPpeak,kPpeak, combined≥1,coincidence factor=1diversity factor\text{load factor} = \frac{P_\text{avg}}{P_\text{peak}}, \qquad \text{diversity factor} = \frac{\sum_k P_{\text{peak},k}}{P_\text{peak, combined}} \ge 1, \qquad \text{coincidence factor} = \frac{1}{\text{diversity factor}}

Diversity is why a transformer feeding 200 homes needs far less than 200 times one home's peak: their peaks happen at different times.

Worked example: a feeder with three customer groups

Given: an 11 kV11\ \text{kV} feeder serves homes, offices and a small factory with the hourly loads in the program below (MW).

Find: each group's peak, the combined peak, the diversity factor and the feeder's load factor and daily energy.

Solve: the program sums the profiles. Homes peak at 2.6 MW2.6\ \text{MW} in the evening, offices at 1.8 MW1.8\ \text{MW} in the late morning, the factory at 1.6 MW1.6\ \text{MW}; the combined peak is 4.50 MW4.50\ \text{MW}, so

DF=(2.6+1.8+1.6) MW4.50 MW=1.333,LF=PavgPpeak=3.225 MW4.50 MW=0.717\text{DF} = \frac{(2.6 + 1.8 + 1.6)\ \text{MW}}{4.50\ \text{MW}} = 1.333, \qquad \text{LF} = \frac{P_\text{avg}}{P_\text{peak}} = \frac{3.225\ \text{MW}}{4.50\ \text{MW}} = 0.717

Check: the daily energy is 24 h⋅3.225 MW=77.4 MWh24\ \text{h} \cdot 3.225\ \text{MW} = 77.4\ \text{MWh}; a feeder sized for the sum of the group peaks (6.0 MW6.0\ \text{MW}) would be a third larger than needed.

python · try it yourself
import numpy as np

h = np.arange(24)
homes   = np.array([0.8,0.7,0.6,0.6,0.6,0.8,1.2,1.6,1.4,1.1,1.0,1.0,1.1,1.0,1.0,1.1,1.4,2.0,2.5,2.6,2.4,2.0,1.5,1.1])
offices = np.array([0.3,0.3,0.3,0.3,0.3,0.3,0.5,1.0,1.5,1.7,1.8,1.8,1.6,1.7,1.7,1.6,1.4,1.0,0.6,0.4,0.4,0.3,0.3,0.3])
factory = np.array([0.6,0.6,0.6,0.6,0.6,0.6,1.2,1.6,1.6,1.6,1.6,1.6,1.4,1.6,1.6,1.6,1.4,0.9,0.6,0.6,0.6,0.6,0.6,0.6])
total = homes + offices + factory
peaks = [g.max() for g in (homes, offices, factory)]
print("group peaks (MW):", [float(p) for p in peaks])
print(f"combined peak {total.max():.2f} MW at {h[total.argmax()]}:00")
print(f"diversity factor {sum(peaks) / total.max():.3f}")
print(f"average {total.mean():.2f} MW, load factor {total.mean() / total.max():.3f}, energy {total.sum():.1f} MWh/day")
group peaks (MW): [2.6, 1.8, 1.6]
combined peak 4.50 MW at 8:00
diversity factor 1.333
average 3.23 MW, load factor 0.717, energy 77.4 MWh/day

The combined peak comes at 8:00, when the homes' morning load (1.4 MW1.4\ \text{MW}) overlaps offices and the factory starting work (1.5+1.6 MW1.5 + 1.6\ \text{MW}), not in the evening when the homes alone reach 2.6 MW2.6\ \text{MW} but the feeder carries only 3.6 MW3.6\ \text{MW}. Finding the coincident peak needs the time series, not the group maxima.

Guided lab: read your own load curve (no mains work)

Hand calculation. Estimate your home's peak and average demand from the appliances you know (a kettle is about 2 kW2\ \text{kW} for minutes, a fridge 100 W100\ \text{W} on average).

Simulation. Replace one of the arrays in the program with 24 hourly values from your own estimate or from your electricity supplier's online account, and compute your load factor.

What you would measure. Most smart meters and supplier apps export half-hourly or hourly energy; reading them involves no contact with any wiring. A typical home shows a load factor of 0.20.2 to 0.40.4 (short, high peaks), a factory working two shifts 0.60.6 to 0.80.8. Hourly data hides short peaks (the kettle), so the true peak is higher than the hourly maximum: expect the hourly peak to understate it by a factor of two or more for a single home.

Hazards and safe setup. Read data only. Never open a meter cabinet or remove a cover: meter terminals are live and are the supplier's equipment.

Pitfalls

  • Adding peaks. Peaks of different loads do not add; use the diversity factor or, better, the time series.
  • Looking for the peak where one group peaks. The feeder peak in the example is at 8:00, not at the homes' evening peak.
  • Nominal versus highest voltage. Switchgear for an 11 kV11\ \text{kV} system is rated 12 kV12\ \text{kV}; insulation is chosen for UmU_m and for surges, not for the nominal voltage.
  • Disconnector versus breaker. A disconnector must never break load current; interlocks stop it.

Practice

  1. What is the highest voltage for equipment of a 400 kV400\ \text{kV} system?
  2. Three loads peak at 55, 33 and 4 MW4\ \text{MW}; their combined peak is 9.6 MW9.6\ \text{MW}. Find the diversity and coincidence factors.
  3. Why do cities use cables, and rural areas overhead lines?
Answer
  1. Um=420 kVU_m = 420\ \text{kV}.
  2. DF=12/9.6=1.25\text{DF} = 12/9.6 = 1.25; coincidence factor =0.8= 0.8.
  3. Cables need little space and are invisible but cost several times as much; in a city land and appearance decide, in the country cost and easy repair of overhead lines do.

Test yourself

Which device may open a circuit carrying a fault current?

  1. disconnector
  2. earthing switch
  3. circuit breaker
  4. busbar

Compared with an overhead line of the same voltage, a cable has…

  1. more series inductance and less capacitance
  2. less series inductance and much more capacitance
  3. the same parameters
  4. no capacitance

A feeder's average load is 3 MW and its peak 5 MW. Its load factor is…

  1. 0.6
  2. 1.67
  3. 0.4
  4. 15

Why is a double-busbar substation used at important nodes?

  1. It needs fewer breakers
  2. Circuits can be moved to the other bus, so one busbar outage does not lose them
  3. It removes the need for protection
  4. It halves the fault current