Energy Storage, Capacity Factor and LCOE
A grid with a lot of solar has too much energy at noon and too little at 19:00. Storage moves energy in time, but every cycle loses some of it, and a battery that can deliver for one hour is a very different asset from one that delivers for four hours. Planners also need a fair way to compare a wind farm that costs a lot to build and nothing to run with a gas plant that is cheap to build and costly to fuel. This lesson covers storage ratings and services, then the two numbers everyone quotes when comparing generation: the capacity factor and the levelised cost of electricity (LCOE).
Safety: grid batteries hold megawatt-hours of energy at hundreds of volts DC and lithium cells can go into thermal runaway; this lesson is calculation and simulation only. The bench lab uses a capacitor charged to from a current-limited supply, never lithium cells.
Storage technologies
| Technology | Typical duration | Round-trip efficiency | Notes (2020s typical values) |
|---|---|---|---|
| pumped hydro | to | to | most of the world's installed storage energy; needs suitable geography |
| lithium-ion battery (BESS) | to | to (AC to AC) | fast response (well under a second), modular, falling cost; degrades with cycles and calendar age |
| flywheel | seconds to minutes | to | frequency services, high cycle life |
| compressed air (CAES) | hours | to | few plants; caverns needed |
| hydrogen (electrolyser, storage, fuel cell or turbine) | days to seasons | to | the main candidate for seasonal storage, expensive today |
A storage plant has two ratings: power (MW, set by its converter or turbine) and energy (MWh, set by its cells or reservoir). Their ratio is the duration. The round-trip efficiency includes converter and auxiliary losses. Batteries also have a usable state-of-charge window (often to ) and a cycle life that depends on depth of discharge.
What storage is paid for
- Arbitrage: charge when energy is cheap, discharge when it is dear. Profitable only if the price spread beats the losses: discharge price gt; $ charge price .
- Frequency response: batteries can deliver full power within a fraction of a second after a frequency drop (Frequency Control); this was the first large market for grid batteries.
- Capacity / peak shaving: be available at the system peak, or keep a customer's demand under a contract limit.
- Network deferral, black start, smoothing renewable output, and synthetic inertia from grid-forming converters.
Capacity factor
Typical published ranges (2020s): nuclear to , CCGT to (it depends on how it is dispatched), onshore wind to , offshore wind to , utility PV to . A low capacity factor is not "inefficiency": it says how many hours the fuel (wind, sun) or the market made available.
Levelised cost of electricity
LCOE is the constant price per MWh that would exactly repay all costs over the plant's life at a discount rate :
with investment , operation and maintenance , fuel and energy in year . With constant yearly costs and energy and all investment at the start, it simplifies with the capital recovery factor :
LCOE ignores when the energy is delivered and what the grid needs around it (firm capacity, inertia, network, balancing); a solar MWh at noon is worth less than a gas MWh at the evening peak. "System LCOE" and value-adjusted metrics try to correct for this.
Worked example: three plants compared
Given: illustrative 2020s-style assumptions, per kW installed: onshore wind CAPEX , O&M per year, CF , 25 years; utility PV CAPEX , O&M , CF , 30 years; CCGT CAPEX , O&M , CF , 30 years, fuel per MWh (from Thermal Generation); discount rate . (Currency units are arbitrary and the numbers are not market data.)
Find: the LCOE of each.
Solve (wind):
The program gives PV and CCGT per MWh.
Check: for the CCGT, fuel is of the : three quarters of its cost depends on the gas price, while wind and PV costs are almost all capital, which makes them very sensitive to the discount rate (see the program).
In Python: LCOE and a battery doing arbitrage
import numpy as np
def crf(r, n):
return r * (1 + r)**n / ((1 + r)**n - 1)
plants = { # CAPEX per kW, O&M per kW-year, CF, life (years), fuel per MWh
"onshore wind": (1400, 40, 0.30, 25, 0.0),
"utility PV": (800, 15, 0.18, 30, 0.0),
"CCGT": (900, 25, 0.55, 30, 61.4),
}
for r in (0.04, 0.07, 0.10):
row = []
for name, (capex, om, cf, life, fuel) in plants.items():
lcoe = (capex * 1000 * crf(r, life) + om * 1000) / (8760 * cf) + fuel
row.append(f"{name} {lcoe:5.1f}")
print(f"r = {r:.0%}: " + " | ".join(row))
# A 25 MW / 100 MWh battery, 88 % round trip, and one day of hourly prices
price = np.array([42, 38, 35, 33, 34, 40, 55, 70, 62, 45, 30, 22, 18, 17, 20, 28, 45, 80, 110, 105, 85, 70, 58, 48])
P, E, eta = 25.0, 100.0, 0.88
order = np.argsort(price)
charge = sorted(order[:4]) # four cheapest hours (100 MWh at 25 MW)
discharge = sorted(order[-4:]) # four dearest hours
cost = price[charge].sum() * P
revenue = price[discharge].sum() * P * eta
print("charge at hours", [int(h) for h in charge], "discharge at hours", [int(h) for h in discharge])
print(f"bought {E:.0f} MWh for {cost:.0f}, sold {E*eta:.0f} MWh for {revenue:.0f}, margin {revenue - cost:.0f} per day")
print(f"break-even spread: discharge price must exceed charge price / {eta} = {1/eta:.3f} x charge price")r = 4%: onshore wind 49.3 | utility PV 38.9 | CCGT 77.4
r = 7%: onshore wind 60.9 | utility PV 50.4 | CCGT 81.6
r = 10%: onshore wind 73.9 | utility PV 63.3 | CCGT 86.4
charge at hours [11, 12, 13, 14] discharge at hours [17, 18, 19, 20]
bought 100 MWh for 1925, sold 88 MWh for 8360, margin 6435 per day
break-even spread: discharge price must exceed charge price / 0.88 = 1.136 x charge price
The battery charges in the midday solar trough and discharges into the evening peak. Its daily margin has to pay back its capital, its degradation and its grid charges; with a few hundred cycles a year, this simple price shape is the business case of many 2020s battery projects.
Interactive: charging a capacitor wastes energy in the resistor
Storage always pays a loss on the way in and out. The RC lab, set to , and (), shows after a capacitor voltage of and a stored energy of . The supply delivered for a full charge: half went into the resistor as heat, whatever its value. Charging slowly through a converter instead of a resistor is how real storage beats this limit.
Guided lab: round-trip efficiency of a supercapacitor
Hand calculation. A , supercapacitor charged to stores . Charged at a constant current of it takes .
Simulation. Use the RC lab to see why charging from a fixed voltage through a resistor loses half; with constant-current charging the loss is only .
What you would measure. Charge from a bench supply in constant-current mode ( limit, voltage set to ), logging voltage and current every second; then discharge through a resistor while logging the voltage. Integrate for both. Expect a round-trip efficiency of to for a low-ESR part during the constant-current phase, lower once the supply switches to constant voltage; logging every second gives perhaps uncertainty.
Hazards and safe setup. Respect the capacitor's voltage rating and polarity (an overvolted supercapacitor can vent); short-circuit currents from a charged supercapacitor are large, so never short its terminals; no lithium cells.
Pitfalls
- MW and MWh confused. A "100 MW battery" says nothing about how long it lasts.
- Comparing LCOEs from different sources. Discount rate, fuel price and capacity factor assumptions dominate the result; compare only like with like.
- LCOE as value. It is a cost metric; it ignores timing, location and grid services.
- Prices change quickly. Battery and PV costs fell several-fold within a decade; date every cost figure you use.
Practice
- A , battery with charges at per MWh. What discharge price breaks even on energy alone?
- A plant produces a year from . What is its capacity factor?
- Compute the CRF for and years.
Answer
- per MWh.
- .
- .
Test yourself
A battery rated 20 MW / 80 MWh has a duration of…
- 0.25 h
- 4 h
- 60 h
- 1600 h
Which cost component dominates the LCOE of a wind farm?
- fuel
- capital (investment) and its financing
- carbon cost
- start-up costs
With 90 % round-trip efficiency, buying at 30 and selling at 32 per MWh…
- makes a profit
- loses money
- breaks even
- depends on MW rating only
Why does LCOE alone not settle whether to build solar or gas?
- It includes fuel twice
- It ignores when the energy is produced and the firm capacity and grid services needed
- It only applies to nuclear
- It uses nominal not real prices